How can this website be improved? Give us your feedback
2014
Category: Safety
Type: Guide or guidance
Guidance to Angling risk assessment related to the default 30 metre Angling Exclusion Zone
2022
Category: Engineering
Type: Form
Form to detail confirmation of the decommissioning of a Power Generating Module connected in parallel with the public Distribution Network in accordance with Engineering Recommendation G99.
2022
Category: Engineering
Type: Form
Commissioning check form to be completed for every Power Generating Facility - appendices from Engineering Recommendation G99 (Connection of generation >3.68kW)
2022
Category: Engineering
Type: Form
G99 Form for Site Compliance and Commissioning test requirements for Type C and Type D Power Generating Modules to be completed if site compliance tests are being undertaken.
2022
Category: Engineering
Type: Form
Power Generating Module Document for Type C and Type D Power Generating Modules to be completed by the Generator - appendices from Engineering Recommendation G99.
2022
Category: Engineering
Type: Form
Installation and Commissioning Confirmation Form for Type B PGMs to be completed for every Power Generating Facility - appendices from Engineering Recommendation G99.
2022
Category: Engineering
Type: Form
G99 Form for Site Compliance and Commissioning test requirements for Type B Power Generating Modules to be completed if site compliance tests are being undertaken.
2022
Category: Engineering
Type: Form
Power Generating Module Document for Type B Power Generating Modules. Compliance statement to be completed by the Generator - appendices from Engineering Recommendation G99.
2022
Category: Engineering
Type: Form
Installation Document for Integrated Micro Generation and Storage - appendices from Engineering Recommendation G99 (Connection of generation >3.68kW)
2022
Category: Engineering
Type: Form
Installation Document for Type A Power Generating Modules (Form A3-1) and Integrated Micro Generation and Storage (Form A3-2) - appendices from Engineering Recommendation G99
2022
Category: Engineering
Type: Form
This G99 form should be completed if site compliance tests are being undertaken for some or all of the Interface Protection where it is not Type Tested and for other compliance tests.
2022
Category: Engineering
Type: Form
Compliance Verification Report for Type A Inverter Connected Power Generating Modules - appendices from Engineering Recommendation G99 (Connection of generation >3.68kW)
2022
Category: Engineering
Type: Form
G99 Compliance Verification Report for Synchronous and Asynchronous (non inverter) Power Generating Modules > 50 kW and also for Synchronous and Asynchronous (non inverter) Modules.
2022
Category: Engineering
Type: Form
Compliance Verification Report for Synchronous and Asynchronous (non inverter) Power Generating Modules up to and including 50 kW - appendices from Engineering Recommendation G99.
2022
Category: Engineering
Type: Form
Application for connection of Fully Type Tested Integrated Micro Generation and Storage installations - appendices from Engineering Recommendation G99 (Connection of generation >3.68kW)
2022
Category: Engineering
Type: Form
Application for connection of Power Generating Module(s) with Total Aggregate Capacity
2022
Category: Engineering
Type: Form
G98 Micro-generator de-commissioning form and declaration to be completed by the Installer no later than 28 days after de-commissioning all, or some of the Micro-generators.
2022
Category: Engineering
Type: Form
This form should be used when making a Type Test submission to Energy Networks Association (ENA) and is the Manufacturer’s declaration of compliance with the requirements of G98.
2022
Category: Engineering
Type: Form
G98 Installation form for connection under Connection of generation
2002
Category: Engineering
Type: Form
G98 Application for connection of multiple Micro-Generating installations Connection of generation
2018
Category: Engineering
Type: Form
Demand Side Response proformas (DSR1-3) for Demand Units and Installation with supporting definitions and explanatory notes
2019
Category: Innovation
Type: Form
Form used to notify or apply to the network operator for multiple Low Carbon Technologies (Electric Vehicle Charge Points, including Vehicle-to-Grid, or Heat Pumps) installations
2019
Category: Innovation
Type: Form
Form used to submit Split-System Heat Pump equipment specifications to the main Heat Pump Database
2021
Category: Open Networks
Type: Consultation
Consultation responses to Workstream 3 Future Worlds (2019)
2021
Category: Open Networks
Type: Consultation
Open Networks 2019 response to Workstream 3 Impact Assessment consultation
2021
Category: Open Networks
Type: Consultation
Workstream 3 Annex 1: Consultation Analysis Results
2021
Category: Open Networks
Type: Consultation
Consultation on Workstream 3 Future Worlds impact assessment
2018
Category: Open Networks
Type: Consultation
Workstream 3 Developing change options to facilitate energy decarbonisation, digitisation and decentralisation