Explore sections within
Resource library:
Resource library:
- The Gas Goes Green programme 2023 work roadmap
- G99 Form B3
- G99 Form C2.1
- G99 Form C2.2
- G99 Form C3
- G99 Form D1
- Angler Safety and Risk Assessment (30 m Angling Exclusion Zone)
- Angling Guidance Sheet
- Angler Safety and Risk Assessment (overhead power lines)
- Fish Safe A5 Flyer
- Fish Safe Sticker
- Angling Guidance for Anglers
- Angling Guidance for Management
- Angling Guidance for Planning Authorities
- Look Out, Look Up! Campaign Toolkit 2018
- Farmers & Agricultural Contractors Safety Advice
- Mechanical Plant Safety Advice
- Electricity Around Your Home Public Safety Leaflet
- Emergency Services Public Safety Leaflet
- General Trade and Maintenance Public Safety Leaflet
- Leisure Activities Public Safety Leaflet
- Look Out, Look Up! Public Safety Leaflet
- Watch Out, Cables About! Public Safety Leaflet
- Electric and Magnetic Fields Facts
- Electric and Magnetic Fields Information
- Electric and Magnetic Fields Networks Training
- Phasing of UK Overhead Power Lines Report
- Industry Health Outcomes National Survey
- Control of Electromagnetic Fields at Work Regulations 2016 (Risk Assessment)
- OHAG Guidance Note 1.1 Occupational Health in the Electricity Industry
- OHAG Guidance Note 1.2 Role of Occupational Health in Sickness Absence Management
- OHAG Guidance Note 1.3 Equality Act
- OHAG Guidance Note 1.4 Workplace rehabilitation
- OHAG Guidance Note 1.5 Automated External Defibrillators
- OHAG Guidance Note 1.6 Health surveillance
- OHAG Guidance Note 2.1 Stress
- OHAG Guidance Note 2.2 Management of back pain in the Electricity Industry
- OHAG Guidance Note 3.1 Working in Adverse thermal Environments
- OHAG Guidance Note 3.2 Working in confined spaces
- OHAG Guidance Note 3.3 Night work
- OHAG Guidance Note 3.4 Fitness to work at Heights
- OHAG Guidance Note 3.5 Fitness for Wind Turbine Working - web site
- OHAG Guidance Note 4.1 Noise and Vibration
- OHAG Guidance Note 4.2 Upper Limb Disorders
- OHAG Guidance Note 4.3 Biomass
- OHAG Guidance Note 4.4 Call Centre Working
- OHAG Guidance Note 4.5 Asthma in the Electricity Industry
- EMF - Design and Management of Low Voltage Distribution Networks Guidance (EREC G92)
- G98 Distributed Generation Connection Guide (Multiple Premises)
- G98 Distributed Generation Connection Guide (Single Premises)
- G98 Connecting Domestic-Scale Type Tested Generation Summary Guide (Single Premises)
- G99 Connecting Type A Power Generating Modules Guide
- G99 Connecting Type B - D Power Generating Modules Guide
- G99 Type A summary
- G99 Types B-D summary
- Energy Delivery Systems Cyber Security Procurement Guidance
- Smart Meters - Electricity Network Operator Configurations (EREC M30)
- Smart Meters - How to Report Gas Asset Condition Issues (GER1)
- Smart Meters - How to Report Common Gas Issues (GER2)
- Smart Meters - Top 5 Gas Smart Meter Interventions (GER4)
- Smart Meters - Correct Reporting of Exposed PE Pipe (GER5)
- ON18-WS3-FW Open Networks Models User Guide
- SAGE First Interim Assessment Guide
- Ecological and Archaeological Management Best Practice Guide
- Steel Lattice Tower Refurbishment Good Practice Guide
- ENA and Environment Agency Partnership Agreement
- Health and Wellbeing Framework
- Powering Improvement Occupational Health Delivery Plan 2010
- Cut-Out Rating Guidance to Electric Vehicles or Heat Pumps Installers
- Low Carbon Technologies User Guidance for Heat Pump Database Submission
- Switchgear Assessment Panel Notice of Conformity List
- Protection Assessment Panel Notice of Conformity List
- Electricity Supply Emergency Code
- Electric Vehicle Charge Points and Heat Pumps Combined Installation Process Flow Chart
- Accelerated Loss of Mains Change Programme Assessment Flow Chart
- ON18-WS3-FW DSO Future Worlds - Least Regrets Tables
- ON19-WS1B-P4 Enhanced Schedule 11
- ON19-WS1B-P4 Schedule 5 Enhanced Node Data
- Low Carbon Technologies Heat Pump and Electric Vehicle Network Operator Contacts
- ON17-WS2 Customer Information Requirements
- ON17-WS2-P3 Customer Journey (New or Modified Connections)
- ON17-WS2-P3 Customer Journey (Post-connection)
- ON18-WS2-P1 Pre Application Good Practice
- ON19-PRJ-PID PID Consultation Summary and Actions
- ON20-WS1A-P5 DSO Revenue Stacking
- ON20-WS2-P2 Contracted Connections Queue Management Consultation Document
- ON19-WS3-P5 Introductory Slides - Innovation Trials Mapping
- ON18-WS1A Flexibility Commitment 2018
- ON19-WS1A Open Networks Flexibility Commitment - Steps for Delivering Flexibility Services 2019
- ALoMCP Public Issues Log
- ALoMCP General FAQs
- ALoMCP Contractual Terms and Conditions
- ALoMCP Delivery Assurance Policy
- ALoMCP Payment Process Specification
- ALoMCP Technical FAQs
- ALoMCP Protection Support Organisations
- ON21-WS3-P1 DSO Implementation Plan Appendices - detailing DSO functions (31 Mar 2021)
- ON19-WS3-FW Final Future World results
- ON19-WS3-FW Final Future World results - Sensitivity
- ON19-WS3 Impact Assessment on Future DSO Worlds (Benefits)
- ON19-WS3-FW DSO Transition - Integrated World Costs
- ON19-WS3 Impact Assessment on Future DSO Worlds (Costs)
- Smart Meters - Benefits for Demand Response Based Control of Distribution Networks
- Smart Meters - Data Aggregation Benefits Reduction
- Smart Meters - Data Aggregation Executive Summary
- Smart Meters - Data Aggregation Assessment Final Report
- Smart Meters - Functional Requirements for Electricity Smart Meters
- Smart Meters - High Level Cost Benefit Analysis Summary
- Smart Meters - High Level Cost Benefit Analysis
- Smart Meters - High Level Data Traffic Analysis
- Smart Meters - Consumer Attitudes to Half Hourly Consumption Data
- Smart Meters - Opportunities for Demand Response
- Smart Meters - Strategic Issues and Action Planning for Demand Response
- Smart Meters - Privacy Impact Assessment of Networks Using Smart Meter Data
- Smart Meters - Security and Privacy Control Points
- Smart Meters - System Use Cases
- Trading of Non-firm DG Curtailment Obligations & Exchange of Access Rights Report
- ON17-PRJ 2017 End of Year Report
- ON17-WS1-P7 Statement of Works Customer Journey
- ON17-WS1-P7 Statement of Works Data Template
- ON17-WS2 Customer Category Descriptions
- ON17-WS2 Information on Distribution Connection Options
- ON18-PRJ 2018 End of Year Report
- ON18-PRJ 2018 End of Year Report Summary
- ON18-PRJ 2018 Project Initiation Document (Post-Consultation)
- ON18-WS1-P11 Flexible Resources Connection Guide
- ON18-WS1-P7 ANM Curtailment Process and Good Practice Guide
- ON18-WS2-P1 Good Practice ahead of Connection Applications
- ON18-WS2-P4 Good Practice for information provision on Flexibility Services
- ON18-WS2-P6 Guidance on post-connection changes
- ON18-WS3 DSO Transition Pathway - Least Regrets Analysis 2019 PID Input
- ON18-WS3 Modelling DSO transition using the Smart Grid Architecture Model
- ON18-WS3-P2 DSO Functional & System requirements (SGAM Modelling)
- ON19-PRJ Open Networks 2019 End of Year Report
- ON19-PRJ 2019 Project Initiation Document (Post-Consultation)
- ON19-PRJ Open Letter to Ofgem & BEIS
- ON19-WS1A-P1 Flexibility Market Principles
- ON19-WS1A-P3 Flexibility Services - Dispatch and Settlement Processes
- ON20-WS1A-P5 Conflict Management & Cooptimisation DSO Services - Final Report
- ON19-WS1B-P4 Proposals for Implementation of Exchange of Network Planning Data (planning timescales)
- ON19-WS1B-P4 Exchange of Network Planning Data (planning timescales) Data Scope - Final Report
- ON19-WS3 DSO Transition Future Worlds Impact Assessment Report
- ON19-WS3 DSO Transition - Future World Impact Assessment Report (independent assessment)
- ON19-WS4 Whole Energy Systems 2019 activity - Final Report
- ON20-PRJ Open Networks 2020 PID Consultation Detailed Comments and Responses
- ON20-PRJ Open Networks 2020 Workplan Consultation Summary
- ON20-PRJ 2020 Project Initiation Document (Post-Consultation)
- ON20-WS1B-P5 Network Capacity Indications Survey - Final Report
- ON19-WS3-P5 DSO Transition Mapping - Innovation Trials Final Report
- ON20-WS4-P3 Gas input to Whole System FES Phase 1 Report
- ON20-WS4-P6 Data for Capacity Mapping
- Public Safety Annual Review 2019
- SAGE First Interim Assessment Precautionary Approaches to ELF EMFs
- Health and Safety Issues Eurelectric Report 2014
- Health & Wellbeing Framework Position Paper 2017
- Smart Meters - System Requirements Update
- Smart Meters - Data Traffic Analysis
- Gas and Electricity Network Innovation Strategy 2020 (Summary)
- Electricity Network Innovation Strategy 2020
- Gas Network Innovation Strategy 2020
- Electricity Network Innovation Strategy 2018
- Gas Network Innovation Strategy 2018 (Summary)
- Gas Network Innovation Strategy 2018
- Networks Innovation Strategies 2020 Stakeholder Engagement (Survey)
- Networks Innovation Strategies 2020 Stakeholder Engagement (Workshop)
- ENA Public Safety Commitment 2020-2022
- Powering Improvement Industry Strategy 2020-2025
- Gas Goes Green Launch Document - April 2020
- Gas Goes Green Advisory Group May 2020 - Meeting Slides
- Gas Goes Green Advisory Group May 2020 - Minutes
- Gas Goes Green Advisory Group May 2020 - Poll Results
- Gas Goes Green Advisory Group May 2020 - Responses to Questions
- Gas Goes Green webinar on the Green Gas Support Scheme - slides
- Gas Goes Green webinar on the Green Gas Support Scheme - Questions
- Gas Goes Green Zero Carbon Commitment - May 2020
- Gas Goes Green Hydrogen Cost to Customer Report - May 2020
- Gas Goes Green webinar supporting IGEM’s peer review consultation for gas quality and changes to GS(M)R - slides
- Gas Goes Green Webinar supporting IGEM’s peer review consultation for gas quality and changes to GS(M)R - responses
- Gas Goes Green webinar exploring hydrogen deblending - slides
- Gas Goes Green webinar exploring hydrogen deblending - speaker biographies
- Gas Goes Green webinar exploring hydrogen deblending - poll results
- Pathways to Net Zero: Decarbonising the Gas Networks in Great Britain
- Network Hydrogen 2020 Project Updates (Mar)
- Network Hydrogen 2020 Project Updates (Apr)
- Network Hydrogen 2020 Project Updates (Jul)
- GIS/C5:2018 Distribution pipe fittings cast in grey cast iron for use up to 7 bar maximum operating pressure
- GIS/C6:2006 Distribution pipe fittings cast in ductile iron for use up to 7 bar maximum operating pressures
- GIS/C8:2006 Distribution split tee and collar pipe fittings cast in grey or ductile iron for use up to 7 bar maximum operating pressures
- GIS/E1:2006 Combined drilling, tapping and service fitting insertion machines for use up to 2 bar
- GIS/E13.1:2019 Gas Filters (80mm Nominal Size and Above) Suitable for Use In the Pressure Range
- GIS/E17-2:2018 Insulation joints, Part 2: Joints operating at pressures not greater than 7 bar
- GIS/E19:2006 Primary iris stop bags
- GIS/E20:2013 Secondary iris stop bags
- GIS/E22:2006 Vehicle-mounted leakage survey equipment — Minimum performance and maintenance requirements for equipment used for winter and trigger surveys
- GIS/E4 Inflatable, Self-Centring Bag Stoppers for Use On Distribution Mains
- GIS/E48:2006 Polyethylene service line tracing equipment
- GIS/E49:2019 Specification for polyethylene (PE) coil trailers, including polyethylene pipe coil trailers capable of safely storing, transporting and dispensing pipe in the
- GIS/E5:2013 Pipe cutting wheels for hand-operated wheeled pipe cutters
- GIS/E58:2006 Gland seals for insertion of polyethylene pipe into low pressure metallic gas mains
- GIS/E59:2006 Foam plug flow stop devices for LP and MP gas mains and services
- GIS/E6 Vaporizers and Foggers for Joint Sealing On Gas Mains
- GIS/EFV1:2006 Flow limiters for polyethylene services operating at pressures above 75 mbar and not exceeding 2.0 bar and for gas flows not exceeding 6 m3h-1
- GIS/F17:2023 In-pipe close fit lined mains connection fittings
- GIS/F2:2013 Main sealing plugs and service connection fittings for use at pressures not greater than 2 bar
- GIS/F7:2006 Specification for steel welding pipe fittings 15mm to 450mm inclusive nominal size for operating pressures not greater than 7 bar
- GIS/F9:2020 Metric and Imperial Stainless Steel Single and Twin Ferrule Compression Fittings
- GIS/GQ7:2006 Specification for equipment for odour intensity monitoring
- GIS/L2 Steelpipe 21.3 mm to 1219 mm Outside Diameter Up to 7 Bar (Supplementary)
- GIS/LC12:2006 Sealant Systems for Joint Repair on Metallic Distribution Pipe Systems (Minor Roads and Footpaths)
- GIS/LC14 Annular Gap Sealants
- GIS/LC25:2006 External Sealant Injection Systems for Joint Repair on Metallic Distribution Pipe 2 Bar or Less
- GIS/LC8-1:2006 Methods of repairing leaking ferrous gas mains, Part 1 - External systems (excluding joint and pipe clamps).
- GIS/LC8-3:2006 Methods of repairing leaking ferrous gas mains, Part 3 - Internal sealing methods
- GIS/LC8-4:2006 Methods of repairing leaking ferrous gas mains, Part 4: Pipe repair clamps, split collars and under pressure branch connections
- GIS/LC9:2006 Specification for methods of repairing joints on screwed pipework
- GIS/PL2-5:2018 Polyethylene pipes and fittings for natural gas and suitable manufactured gas, Part 5: Electrofusion ancillary tooling
- GIS/PL2-4:2019 Polyethylene Pipes and Fittings for Gas Part 4 - Fusion Fittings with Integral Heating Element(s)
- GIS/PL2-6:2018 Polyethylene pipes and fittings for natural gas and suitable manufactured gas, Part 6 - Spigot end fittings for electrofusion and/or butt fusion purposes
- GIS/PL2-7:2013 Polyethylene pipes and fittings for natural gas and suitable manufactured gas, Part 7: Squeeze-off tools and equipment
- GIS/PL2-9:2019 Polyethylene Pipes and Fittings for Natural Gas and Suitable Manufactured Gas
- GIS/SER6:2006 Live Riser Transfer Technique
- GIS/TE/D1.2:2006 Non-tap mains sealing plugs for use in access holes from 2 in to 6 in diameter and for use up to 2 bar MOP
- GIS/TE/D1.3:2006 Holesaws and holesaw taps for use on gas pipes with operating pressures not greater than 2 bar
- GIS/TE/E1.7:2006 Tooling for the removal of caps and plugs from live low pressure services
- GIS/TE/E1.8:2006 Access tool for live entry into a low pressure polyethylene service
- GIS/TE/E1.9:2006 Live mains abandonment equipment for low pressure mains
- GIS/TE/P6.1:2006 Bypass equipment with integral pressure monitoring points for MP PE mains
- GIS/V12:2006 Sealant replacement for valves operating up to and including 2 bar
- GIS/V4:2007 Service isolation valves up to 50 mm diameter for use up to 2 bar maximum working pressures
- GIS/V7-2:2020 Specification for distribution valves, Part 2: Plastics bodied valves of sizes up to and including 180 mm suitable for operation at pressures not exceeding 5.5 bar
- GIS/V9 Part 1 Slamshut Valves for Governor Installations with Inlet Pressures (Spring Operated Diaphragm Type)
- Network Operator Common Network Asset Indices Methodology
- Common Network Asset Indices Methodology Proposed Modifications for RIIO-ED2
- Proposed CNAIM Methodology Changes Explained
- SHE 2019 Presentation Conference Keynote
- SHE 2019 Presentation Human Factors – Company view
- SHE 2019 Presentation Human Factors – Trade Union view
- SHE 2019 Presentation Powering Improvement 2019 – HSL Research Study
- SHE 2019 Presentation Training & Skills
- SHE 2019 Presentation Safety Culture & Behaviours
- SHE 2019 Presentation Environmental Management
- SHE 2019 Presentation Caithness-Moray Project
- SHE 2019 Presentation Public Safety – Organisational Response
- SHE 2019 Presentation Occupational Health – Good Business Sense
- SHE 2019 Presentation Balfour Beatty Transmission & Distribution Project
- SHE 2019 Presentation DSO & Innovation
- SHE 2019 Presentation DSO & Innovation 2
- Guide to the SAGE First Interim Assessment
- Control of Electromagnetic Fields at Work Regulations 2016
- Electric and Magnetic Fields (EMFs) website
- New Exposure Limits Training Video for Electric and Magnetic Fields (EMFs)