getAPIdata() https://cdn.prgloo.com/api/content?startDateTime=2000-01-01&endDateTime=2023-04-03&pageSize=100&page=0getAPIdata() https://cdn.prgloo.com/api/content?startDateTime=2023-03-28&pageSize=100&page=1
RESULT: #1 -> Home
RESULT: #3 -> Hmm, we can't find that.
RESULT: #4 -> Unauthorised
RESULT: #5 -> Sitemap
RESULT: #6 -> Google XML sitemap
RESULT: #20 -> Privacy policy
RESULT: #21 -> Cookie policy
RESULT: #22 -> Energy networks explained
RESULT: #23 -> Creating tomorrow’s networks
RESULT: #24 -> Operating the networks
RESULT: #25 -> Information for customers
RESULT: #27 -> People and careers in energy
RESULT: #28 -> Open Networks
RESULT: #29 -> Gas Goes Green
RESULT: #30 -> Innovation
RESULT: #36 -> Data transition
RESULT: #38 -> Engineering and technical programmes
RESULT: #39 -> Statutory information
RESULT: #40 -> Emergency planning
RESULT: #41 -> Cyber security
RESULT: #42 -> Street work
RESULT: #43 -> Wayleaves
RESULT: #45 -> Connecting to the networks
RESULT: #46 -> Information for connected generators
RESULT: #47 -> Maintaining equipment and systems
RESULT: #48 -> Operational telecommunications
RESULT: #49 -> Radio teleswitch
RESULT: #50 -> Standards and guidance
RESULT: #51 -> DER forum
RESULT: #52 -> Energy storage
RESULT: #53 -> Demand-side services
RESULT: #59 -> Public safety commitment
RESULT: #62 -> What to do if you smell gas
RESULT: #63 -> What to do during a power cut
RESULT: #64 -> Getting extra help from your energy network operator
RESULT: #65 -> How to prepare for storms and bad weather
RESULT: #66 -> What are the signs of carbon monoxide poisoning?
RESULT: #67 -> What are electromagnetic fields?
RESULT: #79 -> About ENA
RESULT: #81 -> Governance and committees
RESULT: #82 -> Our members
RESULT: #84 -> Leadership team
RESULT: #85 -> Careers and culture
RESULT: #86 -> Frequently asked questions
RESULT: #87 -> Publications
RESULT: #88 -> Industry hub
RESULT: #89 -> Events
RESULT: #91 -> Contact
RESULT: #93 -> Databases
RESULT: #108 -> SHE Management Conference
RESULT: #109 -> Energy Innovation Summit
RESULT: #113 -> Search results
RESULT: #116 -> Keeping your energy flowing during Covid-19
RESULT: #118 -> Newsroom
RESULT: #120 -> API
RESULT: #121 -> importer-test
RESULT: #250 -> Unlocking Net Zero through the UK’s energy networks
RESULT: #251 -> Energy Networks Association RSS feed
RESULT: #256 -> News search results
RESULT: #267 -> Resource library
RESULT: #275 -> Thank you
RESULT: #282 -> Who’s my network operator?
RESULT: #285 -> Look Out, Look Up!
RESULT: #287 -> Equipment interventions
RESULT: #291 -> Watch Out, Cables About!
RESULT: #308 -> ON18-WS3 ENA Future Worlds - options to facilitate energy decarbonisation, digitisation and decentralisation
RESULT: #309 -> ON18-WS3 Future Worlds Responses Summary
RESULT: #315 -> ON19-WS3 Consultation DSO Transition Future Worlds Impact Assessment
RESULT: #316 -> ON19-WS3 DSO Transition Future World Impact Assessment - Consultation Detailed Analysis
RESULT: #317 -> ON19-WS3 DSO Transition Future World Impact Assessment Consultation - ONP Response
RESULT: #319 -> ON19-WS3 DSO Transition Future World Impact Assessment Consultation Responses
RESULT: #320 -> Low Carbon Technologies Heat Pump Split System Database Form
RESULT: #321 -> LCT Heat Pump Whole System Database Form
RESULT: #322 -> Electric Vehicle Charge Points and Heat Pumps Multi-install Application Form
RESULT: #323 -> Demand Side Response - Demand Units and Installation Proformas
RESULT: #324 -> G98 Form A
RESULT: #325 -> G98 Form B
RESULT: #326 -> G98 Form C
RESULT: #327 -> G98 Form D
RESULT: #328 -> G99 Form A1.1
RESULT: #329 -> G99 Form A1.2
RESULT: #330 -> G99 Form A2.1
RESULT: #331 -> G99 Form A2.2
RESULT: #332 -> G99 Form A2.3
RESULT: #333 -> G99 Form A2.4
RESULT: #334 -> G99 Form A3.1
RESULT: #335 -> G99 Form A3.2
RESULT: #336 -> G99 Form B2.1
RESULT: #337 -> G99 Form B2.2
RESULT: #353 -> G99 Form B3
RESULT: #354 -> G99 Form C2.1
RESULT: #355 -> G99 Form C2.2
RESULT: #356 -> G99 Form C3
RESULT: #357 -> G99 Form D1
RESULT: #361 -> Single Electric Vehicle Charge Point and Heat Pump Installation Application Form
RESULT: #362 -> Angler Safety and Risk Assessment (30 m Angling Exclusion Zone)
RESULT: #363 -> Angling Guidance Sheet
RESULT: #364 -> Angler Safety and Risk Assessment (overhead power lines)
RESULT: #365 -> Fish Safe A5 Flyer
RESULT: #366 -> Fish Safe Sticker
RESULT: #367 -> Angling Guidance for Anglers
RESULT: #368 -> Angling Guidance for Management
RESULT: #369 -> Angling Guidance for Planning Authorities
RESULT: #370 -> Look Out, Look Up! Campaign Toolkit 2018
RESULT: #371 -> Farmers & Agricultural Contractors Safety Advice
RESULT: #372 -> Mechanical Plant Safety Advice
RESULT: #373 -> Electricity Around Your Home Public Safety Leaflet
RESULT: #374 -> Emergency Services Public Safety Leaflet
RESULT: #375 -> General Trade and Maintenance Public Safety Leaflet
RESULT: #376 -> Leisure Activities Public Safety Leaflet
RESULT: #377 -> Look Out, Look Up! Public Safety Leaflet
RESULT: #378 -> Watch Out, Cables About! Public Safety Leaflet
RESULT: #379 -> Electric and Magnetic Fields Facts
RESULT: #380 -> Electric and Magnetic Fields Information
RESULT: #381 -> Electric and Magnetic Fields Networks Training
RESULT: #382 -> Phasing of UK Overhead Power Lines Report
RESULT: #383 -> Industry Health Outcomes National Survey
RESULT: #384 -> Control of Electromagnetic Fields at Work Regulations 2016 (Risk Assessment)
RESULT: #385 -> OHAG Guidance Note 1.1 Occupational Health in the Electricity Industry
RESULT: #386 -> OHAG Guidance Note 1.2 Role of Occupational Health in Sickness Absence Management
RESULT: #387 -> OHAG Guidance Note 1.3 Equality Act
RESULT: #388 -> OHAG Guidance Note 1.4 Workplace rehabilitation
RESULT: #389 -> OHAG Guidance Note 1.5 Automated External Defibrillators
RESULT: #390 -> OHAG Guidance Note 1.6 Health surveillance
RESULT: #391 -> OHAG Guidance Note 2.1 Stress
RESULT: #392 -> OHAG Guidance Note 2.2 Management of back pain in the Electricity Industry
RESULT: #393 -> OHAG Guidance Note 3.1 Working in Adverse thermal Environments
RESULT: #394 -> OHAG Guidance Note 3.2 Working in confined spaces
RESULT: #395 -> OHAG Guidance Note 3.3 Night work
RESULT: #396 -> OHAG Guidance Note 3.4 Fitness to work at Heights
RESULT: #397 -> OHAG Guidance Note 3.5 Fitness for Wind Turbine Working - web site
RESULT: #398 -> OHAG Guidance Note 4.1 Noise and Vibration
RESULT: #399 -> OHAG Guidance Note 4.2 Upper Limb Disorders
RESULT: #400 -> OHAG Guidance Note 4.3 Biomass
RESULT: #401 -> OHAG Guidance Note 4.4 Call Centre Working
RESULT: #402 -> OHAG Guidance Note 4.5 Asthma in the Electricity Industry
RESULT: #403 -> EMF - Design and Management of Low Voltage Distribution Networks Guidance (EREC G92)
RESULT: #404 -> G98 Distributed Generation Connection Guide (Multiple Premises)
RESULT: #405 -> G98 Distributed Generation Connection Guide (Single Premises)
RESULT: #406 -> G98 Connecting Domestic-Scale Type Tested Generation Summary Guide (Single Premises)
RESULT: #407 -> G99 Connecting Type A Power Generating Modules Guide
RESULT: #408 -> G99 Connecting Type B - D Power Generating Modules Guide
RESULT: #409 -> G99 Type A summary
RESULT: #410 -> G99 Types B-D summary
RESULT: #412 -> ON18-PRJ Open Networks Connection of Generation Guide
RESULT: #413 -> Energy Delivery Systems Cyber Security Procurement Guidance
RESULT: #414 -> Smart Meters - Electricity Network Operator Configurations (EREC M30)
RESULT: #415 -> Smart Meters - How to Report Gas Asset Condition Issues (GER1)
RESULT: #416 -> Smart Meters - How to Report Common Gas Issues (GER2)
RESULT: #417 -> Smart Meters - Top 5 Gas Smart Meter Interventions (GER4)
RESULT: #418 -> Smart Meters - Correct Reporting of Exposed PE Pipe (GER5)
RESULT: #419 -> ON18-WS3-FW Open Networks Models User Guide
RESULT: #420 -> SAGE First Interim Assessment Guide
RESULT: #421 -> Ecological and Archaeological Management Best Practice Guide
RESULT: #422 -> Steel Lattice Tower Refurbishment Good Practice Guide
RESULT: #423 -> ENA and Environment Agency Partnership Agreement
RESULT: #424 -> Health and Wellbeing Framework
RESULT: #425 -> Powering Improvement Occupational Health Delivery Plan 2010
RESULT: #426 -> Cut-Out Rating Guidance to Electric Vehicles or Heat Pumps Installers
RESULT: #427 -> Low Carbon Technologies User Guidance for Heat Pump Database Submission
RESULT: #428 -> Switchgear Assessment Panel Notice of Conformity List
RESULT: #429 -> Protection Assessment Panel Notice of Conformity List
RESULT: #430 -> Electricity Supply Emergency Code
RESULT: #431 -> Electric Vehicle Charge Points and Heat Pumps Combined Installation Process Flow Chart
RESULT: #433 -> Accelerated Loss of Mains Change Programme Assessment Flow Chart
RESULT: #435 -> ON18-WS3-FW DSO Future Worlds - Least Regrets Tables
RESULT: #436 -> ON19-WS1B-P4 Enhanced Schedule 11
RESULT: #437 -> ON19-WS1B-P4 Schedule 5 Enhanced Node Data
RESULT: #440 -> ON20-WS3-P1 DSO Implementation Plan Roadmap (Superseded)
RESULT: #442 -> Low Carbon Technologies Heat Pump and Electric Vehicle Network Operator Contacts
RESULT: #454 -> ON17-WS2 Customer Information Requirements
RESULT: #455 -> ON17-WS2-P3 Customer Journey (New or Modified Connections)
RESULT: #456 -> ON17-WS2-P3 Customer Journey (Post-connection)
RESULT: #468 -> ON18-WS2-P1 Pre Application Good Practice
RESULT: #473 -> ON19-PRJ-PID PID Consultation Summary and Actions
RESULT: #493 -> ON19-WS2-P1 Information Sheet System Wide Resource Register
RESULT: #503 -> ON20-PRJ Open Networks 2020 Workplan Consultation Paper
RESULT: #510 -> ON20-WS1A Open Networks 2020 Flexibility Consultation Paper
RESULT: #519 -> ON20-WS1A-P5 DSO Revenue Stacking
RESULT: #528 -> ON20-WS2-P2 Contracted Connections Queue Management Consultation Document
RESULT: #531 -> ON19-WS3-P5 Introductory Slides - Innovation Trials Mapping
RESULT: #533 -> ON18-WS1A Flexibility Commitment 2018
RESULT: #534 -> ON19-WS1A Open Networks Flexibility Commitment - Steps for Delivering Flexibility Services 2019
RESULT: #537 -> ALoMCP Public Issues Log
RESULT: #538 -> ALoMCP General FAQs
RESULT: #539 -> ALoMCP Contractual Terms and Conditions
RESULT: #540 -> ALoMCP Delivery Assurance Policy
RESULT: #541 -> ALoMCP Payment Process Specification
RESULT: #542 -> ALoMCP Technical FAQs
RESULT: #543 -> ALoMCP Protection Support Organisations
RESULT: #544 -> ON21-WS3-P1 DSO Implementation Plan Appendices - detailing DSO functions (31 Mar 2021)
RESULT: #548 -> ON19-WS3-FW Final Future World results
RESULT: #549 -> ON19-WS3-FW Final Future World results - Sensitivity
RESULT: #550 -> ON19-WS3 Impact Assessment on Future DSO Worlds (Benefits)
RESULT: #551 -> ON19-WS3-FW DSO Transition - Integrated World Costs
RESULT: #552 -> ON19-WS3 Impact Assessment on Future DSO Worlds (Costs)
RESULT: #553 -> Smart Meters - Benefits for Demand Response Based Control of Distribution Networks
RESULT: #554 -> Smart Meters - Data Aggregation Benefits Reduction
RESULT: #555 -> Smart Meters - Data Aggregation Executive Summary
RESULT: #556 -> Smart Meters - Data Aggregation Assessment Final Report
RESULT: #557 -> Smart Meters - Functional Requirements for Electricity Smart Meters
RESULT: #558 -> Smart Meters - High Level Cost Benefit Analysis Summary
RESULT: #559 -> Smart Meters - High Level Cost Benefit Analysis
RESULT: #560 -> Smart Meters - High Level Data Traffic Analysis
RESULT: #561 -> Smart Meters - Consumer Attitudes to Half Hourly Consumption Data
RESULT: #562 -> Smart Meters - Opportunities for Demand Response
RESULT: #563 -> Smart Meters - Strategic Issues and Action Planning for Demand Response
RESULT: #564 -> Smart Meters - Privacy Impact Assessment of Networks Using Smart Meter Data
RESULT: #565 -> Smart Meters - Security and Privacy Control Points
RESULT: #566 -> Smart Meters - System Use Cases
RESULT: #567 -> Trading of Non-firm DG Curtailment Obligations & Exchange of Access Rights Report
RESULT: #568 -> ON17-PRJ 2017 End of Year Report
RESULT: #577 -> ON17-WS1-P7 Statement of Works Customer Journey
RESULT: #578 -> ON17-WS1-P7 Statement of Works Data Template
RESULT: #579 -> ON17-WS2 Customer Category Descriptions
RESULT: #580 -> ON17-WS2 Information on Distribution Connection Options
RESULT: #590 -> ON18-PRJ 2018 End of Year Report
RESULT: #591 -> ON18-PRJ 2018 End of Year Report Summary
RESULT: #592 -> ON18-PRJ 2018 Project Initiation Document (Post-Consultation)
RESULT: #595 -> ON18-WS1-P11 Flexible Resources Connection Guide
RESULT: #608 -> ON18-WS1-P7 ANM Curtailment Process and Good Practice Guide
RESULT: #610 -> ON18-WS1-P8 System Wide Resource Register Feasibility Report
RESULT: #611 -> ON18-WS1-P8 System Wide Resource Register
RESULT: #612 -> ON18-WS2-P1 Good Practice ahead of Connection Applications
RESULT: #616 -> ON18-WS2-P4 Good Practice for information provision on Flexibility Services
RESULT: #617 -> ON18-WS2-P6 Guidance on post-connection changes
RESULT: #618 -> ON18-WS2-P7 Provision of Constraint Information
RESULT: #623 -> ON18-WS3 DSO Transition Pathway - Least Regrets Analysis 2019 PID Input
RESULT: #624 -> ON18-WS3 Modelling DSO transition using the Smart Grid Architecture Model
RESULT: #625 -> ON18-WS3-P2 DSO Functional & System requirements (SGAM Modelling)
RESULT: #627 -> ON19-PRJ Open Networks 2019 End of Year Report
RESULT: #630 -> ON19-PRJ 2019 Project Initiation Document (Post-Consultation)
RESULT: #631 -> ON19-PRJ Open Letter to Ofgem & BEIS
RESULT: #633 -> ON19-WS1A-P1 Flexibility Market Principles
RESULT: #636 -> ON19-WS1A-P3 Flexibility Services - Dispatch and Settlement Processes
RESULT: #638 -> ON20-WS1A-P5 Conflict Management & Cooptimisation DSO Services - Final Report
RESULT: #644 -> ON19-WS1B-P4 Proposals for Implementation of Exchange of Network Planning Data (planning timescales)
RESULT: #645 -> ON19-WS1B-P4 Exchange of Network Planning Data (planning timescales) Data Scope - Final Report
RESULT: #650 -> ON19-WS3 DSO Transition Future Worlds Impact Assessment Report
RESULT: #651 -> ON19-WS3 DSO Transition - Future World Impact Assessment Report (independent assessment)
RESULT: #653 -> ON19-WS4 Whole Energy Systems 2019 activity - Final Report
RESULT: #655 -> ON20-PRJ Open Networks 2020 PID Consultation Detailed Comments and Responses
RESULT: #656 -> ON20-PRJ Open Networks 2020 Workplan Consultation Summary
RESULT: #657 -> ON20-PRJ 2020 Project Initiation Document (Post-Consultation)
RESULT: #663 -> ON20-WS1B-P5 Network Capacity Indications Survey - Final Report
RESULT: #665 -> ON19-WS3-P5 DSO Transition Mapping - Innovation Trials Final Report
RESULT: #666 -> ON20-WS3-P1 DSO Implementation Roadmap Guide (superseded)
RESULT: #668 -> ON20-WS4-P3 Gas input to Whole System FES Phase 1 Report
RESULT: #669 -> ON20-WS4-P5 Whole System Coordinated Regional Data Gathering - Final Report
RESULT: #670 -> ON20-WS4-P6 Data for Capacity Mapping
RESULT: #671 -> Public Safety Annual Review 2019
RESULT: #672 -> SAGE First Interim Assessment Precautionary Approaches to ELF EMFs
RESULT: #673 -> Health and Safety Issues Eurelectric Report 2014
RESULT: #674 -> Health & Wellbeing Framework Position Paper 2017
RESULT: #675 -> ON20-WS2-P3 Interactivity Go Live 2020 Dates
RESULT: #676 -> Smart Meters - System Requirements Update
RESULT: #678 -> ON18-WS1-P1 Investment Planning Roadmap
RESULT: #679 -> Smart Meters - Data Traffic Analysis
RESULT: #680 -> Gas and Electricity Network Innovation Strategy 2020 (Summary)
RESULT: #681 -> Electricity Network Innovation Strategy 2020
RESULT: #682 -> Gas Network Innovation Strategy 2020
RESULT: #683 -> Electricity Network Innovation Strategy 2018
RESULT: #684 -> Gas Network Innovation Strategy 2018 (Summary)
RESULT: #685 -> Gas Network Innovation Strategy 2018
RESULT: #686 -> Networks Innovation Strategies 2020 Stakeholder Engagement (Survey)
RESULT: #687 -> Networks Innovation Strategies 2020 Stakeholder Engagement (Workshop)
RESULT: #688 -> ENA Public Safety Commitment 2020-2022
RESULT: #689 -> Powering Improvement Industry Strategy 2020-2025
RESULT: #690 -> Gas Goes Green Launch Document - April 2020
RESULT: #691 -> Gas Goes Green Advisory Group May 2020 - Meeting Slides
RESULT: #692 -> Gas Goes Green Advisory Group May 2020 - Minutes
RESULT: #693 -> Gas Goes Green Advisory Group May 2020 - Poll Results
RESULT: #694 -> Gas Goes Green Advisory Group May 2020 - Responses to Questions
RESULT: #695 -> Gas Goes Green Advisory Group Terms of Reference
RESULT: #696 -> Gas Goes Green webinar on the Green Gas Support Scheme - slides
RESULT: #697 -> Gas Goes Green webinar on the Green Gas Support Scheme - Questions
RESULT: #698 -> Gas Goes Green Zero Carbon Commitment - May 2020
RESULT: #699 -> Gas Goes Green Hydrogen Cost to Customer Report - May 2020
RESULT: #701 -> Gas Goes Green webinar supporting IGEM’s peer review consultation for gas quality and changes to GS(M)R - slides
RESULT: #702 -> Gas Goes Green Webinar supporting IGEM’s peer review consultation for gas quality and changes to GS(M)R - responses
RESULT: #704 -> Gas Goes Green webinar exploring hydrogen deblending - slides
RESULT: #705 -> Gas Goes Green webinar exploring hydrogen deblending - speaker biographies
RESULT: #706 -> Gas Goes Green webinar exploring hydrogen deblending - poll results
RESULT: #707 -> Pathways to Net Zero: Decarbonising the Gas Networks in Great Britain
RESULT: #708 -> Network Hydrogen 2020 Project Updates (Mar)
RESULT: #709 -> Network Hydrogen 2020 Project Updates (Apr)
RESULT: #710 -> Network Hydrogen 2020 Project Updates (Jul)
RESULT: #711 -> GIS/14525 Flanged Adaptors and Mechanical Couplings DN50 to DN600 and Up to 2 Bar
RESULT: #712 -> GIS/C5 Distribution Pipe Fittings Cast In Grey Cast Iron for Use Up to 7 Bar
RESULT: #713 -> GIS/C6:2006 Specification for Distribution Pipe Fittings Cast In Ductile Iron for Use Up to 7 Bar Maximum Operating Pressures
RESULT: #714 -> GIS/C8:2006 Specification for Distribution Split Tee and Collar Pipe Fittings Cast In Grey Or Ductile Iron Up to 7 Bar Maximum Operating Pressures
RESULT: #715 -> GIS/DAT12:2019 Aluminium Based Light Metals and Paints In Potentially Hazardous Areas
RESULT: #716 -> GIS/DAT6:2019 Standard Sizes of Carbon and Carbon Manganese Steel Pipe Greater Than 7 Bar
RESULT: #717 -> GIS/E1:2006 Specification for combined drilling, tapping and service fitting insertion machines for use up to 2 bar
RESULT: #718 -> GIS/E13.1:2019 Gas Filters (80mm Nominal Size and Above) Suitable for Use In the Pressure Range
RESULT: #719 -> GIS/E17 Part 2 Insulation Joints Part 2 - Joints Operating At Pressures Not Greater Than 7 Bar
RESULT: #720 -> GIS/E19:2006 Specification for the design, performance and material requirements for inflatable bags for use in the primary (iris supported) position of an iris stop system
RESULT: #721 -> GIS/E20 Secondary Iris Stop Bags
RESULT: #722 -> GIS/E22:2006 Specification for vehicle-mounted leakage survey equipment — minimum performance and maintenance requirements for equipment used for winter and trigger surveys
RESULT: #723 -> GIS/E34 Procurement of Pressure Regulating Modules with Inlet Pressures
RESULT: #724 -> GIS/E4 Inflatable, Self-Centring Bag Stoppers for Use On Distribution Mains
RESULT: #725 -> GIS/E48:2006 Specification for polyethylene (PE) service line tracing equipment purchased or hired for use by the gas transporter
RESULT: #726 -> GIS/E49:2019 Specification for polyethylene (PE) coil trailers, including polyethylene pipe coil trailers capable of safely storing, transporting and dispensing pipe in the
RESULT: #727 -> GIS/E5 Pipe Cutting Wheels for Hand-Operated Wheeled Pipe Cutters
RESULT: #728 -> GIS/E58:2006 Specification for Gland Seals for Insertion of Polyethylene Pipe Into Low Pressure Metallic Gas Mains
RESULT: #729 -> GIS/E59:2006 Specification for Foam Plug Flow Stop Devices for LP and MP Gas Mains and Services
RESULT: #730 -> GIS/E6 Vaporizers and Foggers for Joint Sealing On Gas Mains
RESULT: #731 -> GIS/E8 Searcher Bars
RESULT: #733 -> GIS/EFV1:2006 Flow limiters for polyethylene services operating at pressures above 75 Mbar and not exceeding 2.0 bar and for gas flows not exceeding 6 m3h-1
RESULT: #734 -> GIS/EL8:2006 Specification for the Manufacture of Gasholder Modular Antifreeze Units
RESULT: #735 -> GIS/F10 Ancillary Fittings Used for the Live Insertion of Gas Mains Equal to Or Less Than 75 Mbar
RESULT: #736 -> GIS/F11 Manufacture of Grouted Tee Connections for Metallic Mains Up to 7 Bar
RESULT: #737 -> GIS/F12 Grouted Tee Connections for Metallic Mains Up to 7 Bar
RESULT: #738 -> GIS/F13 Ductile Iron and Fabricated Steel Cap Ends for Use Up to 2bar MOP
RESULT: #739 -> GIS/F16:2006 Specification for In-Pipe Close Fit Lined Pipe Service Fittings
RESULT: #740 -> GIS/F17:2006 Specification for in-pipe close fit lined mains connection fittings
RESULT: #741 -> GIS/F2 Main Sealing Plugs and Service Connection Fittings Not Greater Than 2 Bar
RESULT: #742 -> GIS/F7:2006 Specification for steel welding pipe fittings 15mm to 450mm inclusive nominal size for operating pressures not greater than 7 bar
RESULT: #743 -> GIS/F9:2020 Metric and Imperial Stainless Steel Single and Twin Ferrule Compression Fittings
RESULT: #744 -> GIS/GQ7:2006 Specification for equipment for odour intensity monitoring
RESULT: #745 -> GIS/L2 Steelpipe 21.3 mm to 1219 mm Outside Diameter Up to 7 Bar (Supplementary)
RESULT: #746 -> GIS/LC1:2018 Leak Repair and Annular Sealants for Metallic Gas Mains and Services Up to 7bar
RESULT: #747 -> GIS/LC12:2006 Sealant Systems for Joint Repair on Metallic Distribution Pipe Systems (Minor Roads and Footpaths)
RESULT: #748 -> GIS/LC14 Annular Gap Sealants
RESULT: #749 -> GIS/LC25:2006 External Sealant Injection Systems for Joint Repair on Metallic Distribution Pipe 2 Bar or Less
RESULT: #750 -> GIS/LC8:2006 Part 1 Methods of Repairing Leaking Ferrous Gas Mains Part 1 - External Systems
RESULT: #751 -> GIS/LC8:2006 Part 3 Methods of Repairing Leaking Ferrous Gas Mains Part 3 - Internal Sealing Methods
RESULT: #752 -> GIS/LC8:2006 Part 4 Methods of Repairing Leaking Ferrous Gas Mains Part 4 - Clamps, Collars and Branch Connections
RESULT: #753 -> GIS/LC9:2006 Specification for methods of repairing joints on screwed pipework
RESULT: #754 -> GIS/P16:2020 Dimensions and Applications of Standard Weld End Preparations for Steel Pipe Fittings and Valves
RESULT: #755 -> GIS/PL2 - 5 Polyethylene Pipes and Fittings for Gas Part 5 - Electrofusion Ancillary Tooling
RESULT: #756 -> GIS/PL2 Part 2 Polyethylene Pipes and Fittings for Gas Part 2 - Pipes Up to 5.5 Bar
RESULT: #757 -> GIS/PL2 Part 3 Polyethylene Pipes and Fittings for Gas Part 3 - Butt Fusion Tooling and Ancillary Equipment
RESULT: #758 -> GIS/PL2 Part 4 Polyethylene Pipes and Fittings for Gas Part 4 - Fusion Fittings with Integral Heating Element(s)
RESULT: #759 -> GIS/PL2 Part 6 Polyethylene Pipes and Fittings for Gas Part 6 - Spigot End Fittings
RESULT: #760 -> GIS/PL2 Part 7 Polyethylene Pipes and Fittings for Gas Part 7 - Squeeze-Off Tools and Equipment
RESULT: #761 -> GIS/PL2 Part 8 Polyethylene Pipes and Fittings for Gas Part 8 - Pipes Up to 7 Bar
RESULT: #762 -> GIS/PL2-1 Polyethylene Pipes and Fittings for Gas Part 1 - General & PE Compounds
RESULT: #763 -> GIS/PL2-9:2019 Polyethylene Pipes and Fittings for Natural Gas and Suitable Manufactured Gas
RESULT: #764 -> GIS/PL3 Self Anchoring Mechanical Fittings for Polyethylene Pipe for Gas
RESULT: #765 -> GIS/PL4 Part 1 Elastomeric Diaphragms Part 1 - Homogeneous Diaphragms
RESULT: #766 -> GIS/PRS35 GRP Housings for Gas Regulator Installations and Associated Operation Equipment
RESULT: #767 -> GIS/SER6:2006 Live Riser Transfer Technique
RESULT: #768 -> GIS/TE/D1.2:2006 Specification for non-tap mains sealing plugs for use in access holes from 2 in to 6 in diameter and for use up to 2 bar MOP
RESULT: #769 -> GIS/TE/D1.3:2006 Holesaws and Holesaw Taps for Use On Gas Pipes Not Greater Than 2 Bar
RESULT: #770 -> GIS/TE/E1.7:2006 Specification for tooling for the removal of caps and plugs from live low pressure services
RESULT: #771 -> GIS/TE/E1.8:2006 Specification for access tool for live entry into a low pressure polyethylene service
RESULT: #772 -> GIS/TE/E1.9:2006 Specification for Live mains abandonment equipment for low pressure mains
RESULT: #773 -> GIS/TEP6.1:2006 Specification for Bypass equipment with integral pressure monitoring points for MP PE mains
RESULT: #774 -> GIS/TEP6.3:2007 Specification for equipment used in testing gas mains and gas services with operating pressures not greater than 7 bar
RESULT: #775 -> GIS/V12:2006 Specification for Sealant replacement for valves operating up to and including 2 bar
RESULT: #776 -> GIS/V4:2007 Specification for service isolation valves up to 50 mm diameter for use up to 2 bar maximum working pressures
RESULT: #777 -> GIS/V6:2019 Steel Valves for Use with Natural Gas At Normal Operating Pressures (Supplementary)
RESULT: #778 -> GIS/V7-1:2013 Specification for Distribution valves, Part 1: Metal-bodied line valves for use at pressures up to 16 bar and construction valves for use at pressures up to 7 bar
RESULT: #779 -> GIS/V7-2:2020 Specification for distribution valves, Part 2: Plastics bodied valves of sizes up to and including 180 mm suitable for operation at pressures not exceeding 5.5 bar
RESULT: #780 -> GIS/V7-3:2014 Specification for distribution valves Part 3 - Brass Bodied Manually Operated Ball and Taper Plug Valves
RESULT: #781 -> GIS/V8:2019 Valves (25 mm Nominal Size and Below) for Instrumentation and Control Purposes
RESULT: #782 -> GIS/V9 Part 1 Slamshut Valves for Governor Installations with Inlet Pressures (Spring Operated Diaphragm Type)
RESULT: #783 -> GIS/VA1:2019 Fluid Powered Actuators for Two Position (Open/Closed) Quarter Turn Valves
RESULT: #784 -> GIS/VA2:2019 Electric Powered Actuators for Two Position (Open/Closed) Quarter Turn Valves
RESULT: #785 -> Network Operator Common Network Asset Indices Methodology
RESULT: #786 -> Common Network Asset Indices Methodology Proposed Modifications for RIIO-ED2
RESULT: #787 -> Proposed CNAIM Methodology Changes Explained
RESULT: #788 -> SHE 2019 Presentation Conference Keynote
RESULT: #789 -> SHE 2019 Presentation Human Factors – Company view
RESULT: #790 -> SHE 2019 Presentation Human Factors – Trade Union view
RESULT: #791 -> SHE 2019 Presentation Powering Improvement 2019 – HSL Research Study
RESULT: #792 -> SHE 2019 Presentation Training & Skills
RESULT: #793 -> SHE 2019 Presentation Safety Culture & Behaviours
RESULT: #794 -> SHE 2019 Presentation Environmental Management
RESULT: #795 -> SHE 2019 Presentation Caithness-Moray Project
RESULT: #796 -> SHE 2019 Presentation Public Safety – Organisational Response
RESULT: #797 -> SHE 2019 Presentation Occupational Health – Good Business Sense
RESULT: #798 -> SHE 2019 Presentation Balfour Beatty Transmission & Distribution Project
RESULT: #799 -> SHE 2019 Presentation DSO & Innovation
RESULT: #800 -> SHE 2019 Presentation DSO & Innovation 2
RESULT: #801 -> Guide to the SAGE First Interim Assessment
RESULT: #802 -> Control of Electromagnetic Fields at Work Regulations 2016
RESULT: #803 -> Electric and Magnetic Fields (EMFs) website
RESULT: #804 -> New Exposure Limits Training Video for Electric and Magnetic Fields (EMFs)
RESULT: #807 -> Environment
RESULT: #808 -> Secure, affordable, low carbon: Gas in our future energy system
RESULT: #809 -> ON19-PRJ Open Networks Fact sheet 5 (01 Jan 2019)
RESULT: #810 -> ON19-PRJ Open Networks Fact sheet 4 (01 Jan 2019)
RESULT: #811 -> ON19-PRJ Open Networks Fact sheet 3 (01 Jan 2019)
RESULT: #812 -> ON19-PRJ Open Networks Fact sheet 2 (01 Jan 2019)
RESULT: #813 -> ON19-PRJ Open Networks Fact sheet 1 (01 Jan 2019)
RESULT: #814 -> Frontier - Impact of Geographic Fragmentation
RESULT: #815 -> Frontier Economics research into the Labour Party's Bringing Energy Home proposals
RESULT: #816 -> Beast from the East Factsheet
RESULT: #817 -> Safety information - What you need to do before using your gas supply
RESULT: #818 -> Safety information - Watch Out Cables About
RESULT: #819 -> Safety information - Installing, altering and disconnecting gas services - preventing illegal connections
RESULT: #820 -> Safety information - Avoiding gas supplies when building extensions
RESULT: #821 -> Natonal Energy Action Warm & Safe Homes Guide
RESULT: #822 -> ENA 2019 General Election Manifesto
RESULT: #823 -> Gas Goes Green Infographic - Iron Mains
RESULT: #824 -> EREC G98 Requirements for Connection of Fully Type Tested Micro-generators
RESULT: #825 -> Gas and Electricity Networks Benefits Reporting Framework - Delivery Plan
RESULT: #826 -> National Terms of Connection
RESULT: #827 -> Distribution Guidance Note for Storage
RESULT: #828 -> National Fluid-Filled Cable Operating Code 2015
RESULT: #829 -> Environmental Decommissioning - Fluid-Filled Cables Systems
RESULT: #830 -> Model Distribution Safety Rules
RESULT: #831 -> Environment Briefing 01 - Sulphur Hexafluoride
RESULT: #832 -> Environment Briefing 02 - Transporting Electricity
RESULT: #834 -> Environment Briefing 03 - Noise
RESULT: #835 -> Environment Briefing 04 - Polychlorinated Biphenyls (PCBs)
RESULT: #836 -> Environment Briefing 05 - Contaminated Land
RESULT: #837 -> Decarbonisation Pathway for Scotland - Award Criteria
RESULT: #839 -> Decarbonisation Pathway for Scotland - Scope of Services
RESULT: #841 -> Accessibility
RESULT: #842 -> Network Innovation Competition Call for Ideas 2020/2021 Guidance
RESULT: #843 -> Network Innovation Competition Call for Ideas 2020/2021 Application
RESULT: #844 -> NEDeRS Subscription Instructions
RESULT: #845 -> Electricity distribution scheme eligibility criteria
RESULT: #846 -> Electricity transmission scheme eligibility criteria
RESULT: #852 -> Metal theft
RESULT: #860 -> updater-test
RESULT: #861 -> Distributed Energy Resources (DER) Cyber Security Connection Guidance
RESULT: #863 -> EREC G99 Requirements for Connection of Generation Equipment
RESULT: #865 -> All G98 forms
RESULT: #869 -> All G99 forms
RESULT: #872 -> Gas transporter documents
RESULT: #873 -> Standard Application Form - Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99
RESULT: #874 -> All news and updates
RESULT: #875 -> Decarbonisation Pathway for Scotland - Invitation to Tender
RESULT: #879 -> ON20-WS2-P3 Network Companies Interactivity Process Guide
RESULT: #882 -> ON20-WS4-P3 Gas input into Whole Systems FES Phase 2 Report
RESULT: #883 -> Think Before You Dig
RESULT: #889 -> Accelerated Loss of Mains Change Programme Delivery Assurance
RESULT: #893 -> Accelerated Loss of Mains Change Programme General FAQ
RESULT: #894 -> Accelerated Loss of Mains Change Programme Issues Log
RESULT: #895 -> Accelerated Loss of Mains Change Programme Open Letter
RESULT: #896 -> Accelerated Loss of Mains Change Programme Payment Process
RESULT: #897 -> Accelerated Loss of Mains Change Programme Contractor Directory
RESULT: #901 -> Think Before You Dig! campaign toolkit
RESULT: #902 -> England & Wales Owner and Occupier Wayleave Compensation Rates 2021/22 (a)
RESULT: #903 -> Guide to Advisory Wayleave Payments for Occupiers of Arable Land.
RESULT: #904 -> Fair and Effective Management of DNO Connection Queues: Progression Milestones Best Practice Guide (November 2016)
RESULT: #905 -> Fair and Effective Management of DNO Connection Queues: Treatment of Requests to Change Connection Applications Good Practice Guide (November 2018)
RESULT: #906 -> Electricity (Connection Charges) Regulations 2017 Guidance Document (October 2020)
RESULT: #912 -> ENA Common RIIO2 Scenario report - September 2019
RESULT: #916 -> ON20-WS1B-P2 Coordination of Future Energy Scenario (FES) and Distribution Future Energy Scenario (DFES)
RESULT: #918 -> ON20-WS1A Flexibility Legend
RESULT: #922 -> Gas Goes Green Six Steps to Net Zero
RESULT: #923 -> Gas Goes Green FAQs
RESULT: #924 -> Gas Goes Green Advisory Group November 2020 - summary
RESULT: #932 -> Open Networks 2020 - Flexibility Consultation Feedback and Response
RESULT: #935 -> Keeping the grid stable in a high renewables market event slides
RESULT: #941 -> ON20-WS1A Flexibility Consultation Feedback and Response
RESULT: #951 -> STG Spectrum Narrative Document
RESULT: #952 -> ON20-WS1A Flexibility Consultation Summary
RESULT: #957 -> ON20-WS1A Flexibility Consultation Responses
RESULT: #960 -> ALOMCP Procurement Methodology
RESULT: #961 -> ALoMCP Contact details for DNOs
RESULT: #965 -> ON20-WS1A-P1 Common Evaluation Methodology for Network Investment Decisions - Use Cases
RESULT: #966 -> ON20-WS1A-P1 Common Evaluation Methodology Tool for Network Investment Decisions - User Guide
RESULT: #967 -> ON20-WS1A-P1 Statement for Common Evaluation Methodology for Network Investment Decisions
RESULT: #968 -> ON22-WS1A-P1 Losses Calculation Tool
RESULT: #969 -> ON20-WS1A-P1 Common Evaluation Methodology Tool for Network Investment Decisions
RESULT: #970 -> ON20-WS1A-P2 Procurement Coordination Implementation
RESULT: #971 -> ON20-WS1A-P3 Flexibility Products: Active Power Service definition and implementation plan
RESULT: #972 -> ON20-WS1A-P7 Baselining Methodology for measuring delivery of Flexibility services - Assessment Report
RESULT: #973 -> ON20-WS1A-P7 Baseline Principles for measuring delivery of Flexibility services
RESULT: #974 -> ON20-WS1A-P7 Baselining Next Steps
RESULT: #975 -> ON20-WS1B-P1 End of Year Update
RESULT: #976 -> ON20-WS1B-P3 Operational Forecasting Final Report
RESULT: #977 -> ON20-WS1B-P3 Operational Tripping Scheme Arrangements
RESULT: #978 -> ON20-WS1B-P3 Regional Development Plan Learnings
RESULT: #979 -> ON20-WS1B-P5 Proposed DNO Standard Network Capacity Report
RESULT: #980 -> ON20-WS2-P1 Embedded Capacity Register update - Inclusion of Smaller Assets
RESULT: #981 -> ON20-WS2-P2 Contracted Connections Queue Management User Guide
RESULT: #982 -> ON20-WS2-P2 Contracted Connections Queue Management Consultation Summary
RESULT: #984 -> ON20-WS4-P4 Investment Planning Final Report
RESULT: #985 -> ON20-WS4-P1 Whole Energy Systems (Elec-Gas) Cost Benefit Analysis - Model
RESULT: #986 -> ON20-WS4-P1 Whole Energy System (Elec-Gas) Cost Benefit Analysis - User Guide
RESULT: #987 -> ON20-WS4-P1 Whole Energy System (Elec-Gas) Cost Benefit Analysis Methodology
RESULT: #988 -> ON20-WS4-P5 Whole System Coordinated Gathering of Regional Data - Final Report
RESULT: #989 -> ON20-WS1A-P6 Non-DSO Services Final Report - Review of current innovation projects to support non-DSO services
RESULT: #990 -> ON20-WS1A-P1 Common Evaluation Methodology Tool for Network Investment Decisions - Background
RESULT: #999 -> Metered Connections Guaranteed Standards of Service for Electricity Distribution Companies in England, Wales & Scotland
RESULT: #1000 -> Metered Connections Guaranteed Standards of Service for Electricity Distribution Companies in England, Wales & Scotland
RESULT: #1001 -> ON21-PRJ Open Networks Advisory Group Membership
RESULT: #1002 -> GIS CW2:2020 Specification for Cold Applied Wrapping Tapes and Tape Systems
RESULT: #1003 -> GIS/CW6:2020 Specification for the external protection of steel line pipe and fittings using fusion bonded powder and other coating systems
RESULT: #1004 -> GIS/CW5:2020 Specification for Field applied external coatings for buried pipework and systems
RESULT: #1005 -> GIS/CW9 2020 Specification for External Concrete Coatings
RESULT: #1009 -> ON20-PRJ Open Networks 2020 End of Year Review (15 Jan 2021)
RESULT: #1011 -> ON21-WS1A Flexibility Roadmap - Implementation of local flexibility markets
RESULT: #1012 -> ON21-PRJ-PID Phase 5 Project Initiation Document Pre-Consultation
RESULT: #1014 -> ON21-PRJ Open Networks Workplan Consultation Paper 2021 (06 Jan 2021)
RESULT: #1016 -> Open Networks library
RESULT: #1019 -> Britain's Hydrogen Network Plan
RESULT: #1020 -> Britain's Hydrogen Network Plan - Executive Summary
RESULT: #1021 -> Gas Goes Green Hydrogen Cost to Customer Report - November 2020
RESULT: #1023 -> Gas Goes Green Frequently Asked Questions
RESULT: #1028 -> ON21-WS3-P1 DSO Roadmap Contact List
RESULT: #1029 -> Gas Goes Green Infographic - Hydrogen and Your Home
RESULT: #1031 -> ANM Good Practice Guide 2015
RESULT: #1032 -> Gas Goes Green Advisory Group November 2020 - Minutes
RESULT: #1033 -> ON21-2021 Project Initiation Document
RESULT: #1035 -> ON21-PRJ-PID Consultation Webinar Slides (04 Feb 2021)
RESULT: #1042 -> Bad weather toolkit
RESULT: #1047 -> Tomorrow’s Heat, Today’s Opportunity
RESULT: #1054 -> ON21-WS1A-P4 Updated Common Contract for Flexibility Procurement (01 Mar 2021)
RESULT: #1055 -> ON21-WS2-P2 Contracted Connections Queue Management Open Letter (01 Mar 2021)
RESULT: #1056 -> ON21-WS2-P2 Contracted Connections Queue Management Implementation Plan (01 Mar 2021)
RESULT: #1058 -> ON21-PRJ-AG Advisory Group March Agenda (04 Mar 2021)
RESULT: #1060 -> ON21-WS3-P1: DSO Implementation Plan webinar slides (26 Jan 2021)
RESULT: #1061 -> ON21-PRJ-AG March Advisory Group Presentation Materials (04 Mar 2021)
RESULT: #1062 -> ON21-WS1A-P4 Common Contract for Flexibility Procurement V1.2 - Supporting Slides (01 Mar 2021)
RESULT: #1063 -> GIS/DAT6:2019 Specification for standard sizes of carbon and carbon manganese steel pipe for operating pressures greater than 7 bar
RESULT: #1064 -> GIS/CW2:2020 Specification for cold applied wrapping tapes and tape systems
RESULT: #1065 -> GIS/CW9:2020 Specification for External Concrete Coatings
RESULT: #1066 -> GIS/DAT12:2019 Specification for aluminium based light metals and paints in potentially hazardous areas
RESULT: #1067 -> GIS/P16:2020 Specification for The Dimensions and Applications of Standard Weld End Preparations for Steel Pipe Fittings and Valves
RESULT: #1068 -> GIS/CW5:2020 Specification for Field applied external coatings for buried pipework and systems
RESULT: #1069 -> GIS/CW6:2020 Specification for the external protection of steel line pipe and fittings using fusion bonded powder and other coating systems - requirements and methods of test for coating mate
RESULT: #1070 -> /
RESULT: #1071 -> GIS/V8:2019 Specification for Valves (25mm normal size and below) for instrumentation and control purposes
RESULT: #1072 -> GIS/VA1:2019 Specification for Fluid Powered Actuators for Two Position (Open/Closed) Quarter Turn Valves
RESULT: #1073 -> GIS/VA2:2020 Specification for Electric Powered Actuators for Two Position (Open/Closed) Quarter Turn Valves
RESULT: #1074 -> GIS/F11:2015 Specification for the manufacture of grouted tee connections for metallic mains operating at pressures up to 7 bar
RESULT: #1075 -> GIS/F12:2015 Specification for Grouted tee connections for metallic mains operating at pressures up to 7 bar
RESULT: #1076 -> Resource library CSV export
RESULT: #1078 -> ON21-WS3-P1 DSO Implementation Webinar slides (26 Jan 2021)
RESULT: #1079 -> GIS/PL2-10:2020 Specification for Methods of repairing leaking PE gas mains operating at pressures up to 2 bar (UK) and 4 bar (Ireland)
RESULT: #1081 -> ON21-PRJ Open Governance potential structure outline v2 (18 May 2021)
RESULT: #1082 -> ON18-WS1-SoW TIA Focus Group March
RESULT: #1084 -> Gas Distribution Networks Carbon Monoxide Safety Competition 2022-23 – Terms & Conditions
RESULT: #1085 -> ON21-WS1A ENA Flexibility Figures March 2021 (01 Mar 2021)
RESULT: #1087 -> ON21-WS1A-P7 Baseline Methodologies Webinar slides (26 Feb 2021)
RESULT: #1088 -> Gas Goes Green 2021 Programme Document
RESULT: #1092 -> Gas Goes Green Advisory Group March 2021 - Meeting Slides
RESULT: #1094 -> ON21-PRJ-AG March Advisory Group Meeting notes (04 Mar 2021)
RESULT: #1096 -> ENA GER1 Issue 8
RESULT: #1098 -> Need for Increased Spectrum Allocation and Investment in Operational Telecommunications to Support Electricity Networks
RESULT: #1106 -> Energy Networks Innovation Process Document (ENIP)
RESULT: #1108 -> ENIP Appendix A - PEA Form (RIIO 2)
RESULT: #1109 -> ENIP Appendix B - Implementation Log
RESULT: #1110 -> ENIP Appendix C (i) - Annual Project Progress Report Template
RESULT: #1111 -> ENIP Appendix C (ii) - Project Closedown Report Template
RESULT: #1112 -> ENIP Appendix D - Benefits Table
RESULT: #1113 -> ENIP Appendix E - ENA Annual Innovation Report_Unpublished
RESULT: #1114 -> ON21-WS3-P2 Conflicts of Interest and Unintended Consequences Register (31 Mar 2021)
RESULT: #1115 -> Gas Goes Green Sustainability Report - 2021
RESULT: #1116 -> ON21-WS3-P1 DSO Implementation Plan Report (31 Mar 2021)
RESULT: #1120 -> GIS/E8:2021 Specification for Searcher Bars
RESULT: #1121 -> GIS/F10:2021 Specification for ancillary fittings used for the live insertion of gas mains operating at pressures equal to or less than 75 mbar
RESULT: #1126 -> ON21-WS1A-P1 Common Evaluation Methodology and Tool Webinar Slide Pack (08 Apr 2021)
RESULT: #1128 -> GIS/E34:2021 Specification for the procurement of pressure regulating modules with inlet pressures above 75 mbar but no greater than 7 bar with design flow rates greater than 6 m³/h
RESULT: #1129 -> ON21-WS3-P1 DSO Roadmap data (31 Mar 2021)
RESULT: #1131 -> ON21-WS1A-P4 Common Contract Evolution Report (19 Apr 2021)
RESULT: #1132 -> Entry Customer Forum Terms of Reference
RESULT: #1133 -> Entry Customer Forum Proposal Template
RESULT: #1136 -> ON21-WS3-P1 DSO Roadmap and Implementation Plan Webinar Slide Pack (20 Apr 2021)
RESULT: #1139 -> Low Carbon Technologies Heat Pump Database
RESULT: #1140 -> ENIP appendices
RESULT: #1141 -> ON21-WS2-P5 User Commitment Improvements Presentation (22 Apr 2021)
RESULT: #1142 -> ON21-WS2-P5 User Commitment Improvements Presentation Annex (22 Apr 2021)
RESULT: #1145 -> Table of GIS Standards
RESULT: #1146 -> Standardisation of siloxane limit in gas distribution network systems
RESULT: #1147 -> ON21-PRJ-AG May Advisory Group Meeting Agenda (06 May 2021)
RESULT: #1148 -> ON21-PRJ-AG May Advisory Group Presentation Materials (06 May 2021)
RESULT: #1151 -> Flexibility services
RESULT: #1152 -> Gas Goes Green workstreams
RESULT: #1153 -> Whole energy systems
RESULT: #1154 -> Customer connections
RESULT: #1155 -> Distribution System Operation transition
RESULT: #1156 -> ON21-WS1A-P1 CEM and tool User Forum Terms of Reference (21 May 2021)
RESULT: #1157 -> ON21-WS1A-P1 Process for participating in CEM and tool User Forum (21 May 2021)
RESULT: #1158 -> ON21-WS1A-P6 Market Simulations Report v3.1 (29 Apr 2021)
RESULT: #1161 -> Documents and files
RESULT: #1162 -> Distribution System Operation roadmap
RESULT: #1167 -> Entry Customer Forum - October 2020 minutes
RESULT: #1168 -> Entry Customer Forum - November 2020 minutes
RESULT: #1169 -> Entry Customer Forum - December 2020 minutes
RESULT: #1170 -> Entry Customer Forum - January 2021 minutes
RESULT: #1171 -> Entry Customer Forum - February 2021 minutes
RESULT: #1172 -> Entry Customer Forum - March 2021 minutes
RESULT: #1173 -> Entry Customer Forum - April 2021 minutes
RESULT: #1178 -> Our campaigns
RESULT: #1179 -> Objective Analysis DSO Projects 2019
RESULT: #1180 -> ON20-WS1A-P2 Flexibility Procurement Coordination Implementation plan (01 Dec 2020)
RESULT: #1181 -> ON19-WS2-P3 Terms and Definitions v2 (17 Sep 2019)
RESULT: #1184 -> Smart meters
RESULT: #1185 -> Electric vehicles and heat pumps
RESULT: #1186 -> Hydrogen
RESULT: #1187 -> Biomethane
RESULT: #1188 -> Gas-powered vehicles
RESULT: #1190 -> Collaborative Gas Distribution Networks Discretionary Reward Submission 2018-2022
RESULT: #1191 -> ON20-WS1A-P3 Product Parameter Definitions (01 May 2020)
RESULT: #1193 -> ON18-WS1A-P2 Flexibility Product Definitions (04 Jun 2018)
RESULT: #1195 -> ON21-WS2-P2 Queue Management Webinar Slides (14 May 2021)
RESULT: #1198 -> "Our Expertise, Your Security" – our hydrogen safety commitment
RESULT: #1199 -> ON21-WS1A-P1 Process for participating in CEM and tool User Forum (30 Jul 2021)
RESULT: #1200 -> ON21-WS1A-P1 CEM and tool User Forum Terms of Reference (21 May 2021)
RESULT: #1203 -> ENIC 2020 - 4D Heat
RESULT: #1204 -> ENIC 2020 - Elegancy
RESULT: #1205 -> ENIC 2020 - OptiNet
RESULT: #1206 -> ENIC 2020 - National Grid ESO
RESULT: #1207 -> ENIC 2020 - Closer to real time procurement
RESULT: #1208 -> ENIC 2020 - Boston Spa
RESULT: #1212 -> ON21-WS1A-P9 ANM Curtailment - Provision of Constraint Information (17 Mar 2021)
RESULT: #1213 -> ON21-WS1A-P9 Flexible connections (ANM) Curtailment Info Principles and Key Requirements (24 May 2021)
RESULT: #1214 -> ON21-WS2-P1 Updated ECR Timeline for H1 2021 (22 Apr 2021)
RESULT: #1217 -> ON21-WS1A-P3 Flexible connections (ANM) Legacy contracts review, stakeholder feedback, and recommendations (24 May 2021)
RESULT: #1218 -> Agreed GDN Bottle change procedure
RESULT: #1219 -> ENIC 2020 - DoorStop
RESULT: #1220 -> ENIC 2020 - Scottish & Southern
RESULT: #1221 -> ENIC 2020 - Transforming mains replacement
RESULT: #1222 -> ENIC 2020 - H21
RESULT: #1223 -> ENIC 2020 - H100 Fife
RESULT: #1224 -> ENIC 2020 - LeakVision
RESULT: #1225 -> ON19-WS3 Innovation Mapping to Identify Distribution System Operation Gaps
RESULT: #1226 -> ENIC 2020 - Live service transfer
RESULT: #1227 -> ENIC 2020 - LV UFLT
RESULT: #1228 -> ENIC 2020 - Potential Power
RESULT: #1229 -> ENIC 2020 - SGN Innovation
RESULT: #1230 -> ON21-PRJ-AG May Advisory Group Minutes (06 May 21)
RESULT: #1233 -> Gas Transportation Customer Standards of Performance
RESULT: #1234 -> ON21-PRJ 2021 Project Initiation Document (post-consultation)
RESULT: #1235 -> ON21-PRJ-PID Consultation Responses
RESULT: #1236 -> DNO Notice of Rights 2021
RESULT: #1237 -> DNO Metered Connections Notice of Rights 2021
RESULT: #1238 -> DNO Unmetered Connections Notice of Rights 2021
RESULT: #1239 -> ON21-PRJ-PID Consultation Feedback Responses Summary Slides
RESULT: #1253 -> Gas Goes Green 'Opportunities to get involved' June to December 2021
RESULT: #1254 -> Gas Goes Green Advisory Group - June 2021 Meeting Slides
RESULT: #1255 -> Whole electricity system planning
RESULT: #1267 -> ON21-PRJ-AG July Agenda (08 Jul 21)
RESULT: #1268 -> ON21-WS1A-P7 Technical Specification for a Baseline Methodology Verification Tool (25 Jun 2021)
RESULT: #1269 -> ON21-WS4-P3 Regional Data Repository User Guide
RESULT: #1271 -> England & Wales Owner and Occupier Wayleave Compensation Rates 2021/22 (b)
RESULT: #1272 -> ON21-PRJ-AG Presentation Materials July (08 Jul 2021)
RESULT: #1273 -> ON21-WS1A-P9 ANM Curtailment info Focus Group Workshop
RESULT: #1274 -> ENA Data Triage Playbook
RESULT: #1277 -> Single Electric Vehicle Charge Point and Heat Pump Installation Application Form
RESULT: #1278 -> Low Carbon Technologies Electric Vehicle Charge Point Database
RESULT: #1282 -> ON21-WS2-P5 User Commitment issues table (30 May 2021)
RESULT: #1283 -> Delivery Assurance Policy v4.1
RESULT: #1284 -> ALoMCP FAQ
RESULT: #1291 -> ON21 - July Community Energy Forum - RIIO ED2 Business Plans update (22 July 2021)
RESULT: #1293 -> Low Carbon Technologies Heat Pump Whole System Database Form
RESULT: #1296 -> GIS/F6:2021- Specification for Carbon and Manganese Steel Pipe Pups for Operating Pressures Greater Than 7 Barg
RESULT: #1301 -> ON21-WS1A-P7 Baseline Methodologies Interim Report (30 Jul 2021)
RESULT: #1302 -> ON21-WS1A-P8 Future options for apportioning FC(ANM) curtailment risk (30 Jul 2021)
RESULT: #1303 -> ON21-WS1A-Flexibility Figures 2021 Full Update (30 Jul 2021)
RESULT: #1305 -> ON21-WS2-P1 Inclusion of ESO Balancing Services Information in ECR (30 Jul 2021)
RESULT: #1306 -> ON21-WS1A-P2 Review of DNO-ESO Flexibility Procurement Timelines (30 Jul 2021)
RESULT: #1307 -> ON21-WS1B-P6 Operational DER Visibility Use Cases and Volumes (30 Jul 2021)
RESULT: #1308 -> ON21-WS1B-P7 Identification of Operational Data To Be Shared (30 Jul 2021)
RESULT: #1309 -> ON21-WS1A Flexibility Consultation 2021 Overview (30 Jul 2021)
RESULT: #1310 -> ON21-WS2-P2 Updated Queue Management User Guide (30 Jul 2021)
RESULT: #1311 -> ON21-WS3-P2 Summary of Q2 2021 updates to COI and UC Register (30 Jul 2021)
RESULT: #1312 -> ON21-WS3-P2 Conflicts of Interest and Unintended Consequences Register Q2 Update (30 Jul 2021)
RESULT: #1313 -> ON21-WS4-P4 Whole System Service consultation report (30 Jul 2021)
RESULT: #1314 -> GIS/TE/P6.3:2021 - Specification for Equipment used in testing gas mains and gas services with operating pressures not greater than 7 bar
RESULT: #1316 -> TEST ENA file 202107v1
RESULT: #1318 -> ON21-WS3-P2 Conflicts of Interest and Unintended Consequences webinar slides (09 Aug 2021)
RESULT: #1320 -> ENIC 2014 - Developing Future Power Networks
RESULT: #1321 -> ENIC 2014 - Energy Networks and Cyber Security
RESULT: #1322 -> ENIC 2014 - Enhancing Asset Ratings
RESULT: #1323 -> ENIC 2014 - Cable Decommissioning
RESULT: #1324 -> ENIC 2014 - Acoustic Technology
RESULT: #1325 -> ENIC 2014 - Impact of extreme weather
RESULT: #1326 -> ENIC 2014 - Seeker Particles Project
RESULT: #1327 -> ENIC 2014 - Use of CIP
RESULT: #1328 -> ENIC 2014 - HVDC-OLPD
RESULT: #1329 -> ENIC 2015 - Day 2
RESULT: #1330 -> ENIC 2015 - Day 3
RESULT: #1331 -> ENIC 2017 - Day 1
RESULT: #1332 -> ENIC 2017 - Programme
RESULT: #1333 -> ENIC 2018 - Composite repairs
RESULT: #1334 -> ENIC 2018 - Robotic Roadworks and Excavation System
RESULT: #1335 -> ENIC 2018 - Bonded Saddle
RESULT: #1336 -> ENIC 2018 - Hydrogen 100
RESULT: #1337 -> ENIC 2018 - Network Generation Networks
RESULT: #1338 -> ENIC 2018 - Decarbonising domestic heat
RESULT: #1339 -> ENIC 2018 - Gas Demand Forecasting
RESULT: #1340 -> ENIC 2018 - Electrical Network Improvements and System Operability
RESULT: #1341 -> ENIC 2018 - Decarbonisation & Ofgem's Role
RESULT: #1342 -> ENIC 2019 - Experience of NIA funded projects
RESULT: #1343 -> ENIC 2019 - Disrupting the UK Energy System
RESULT: #1344 -> ENIC 2019 - Competitive Network Innovation
RESULT: #1345 -> ENIC 2019 - ENA Technical Losses Working Group
RESULT: #1346 -> ENIC 2019 - Improving electricity forecasting
RESULT: #1347 -> ENIC 2019 - Black Start
RESULT: #1348 -> ENIC 2019 - Sustainable Commercial Model for Networks (SCM)
RESULT: #1349 -> ENIC 2019 - Network Vision
RESULT: #1350 -> ENIC 2019 - IEC 61850
RESULT: #1351 -> ENIC 2019 - Silicon Oil Research
RESULT: #1352 -> ENIC 2018 - Project CLoCC
RESULT: #1353 -> ENIC 2014 - IFI RPAS BVLOS
RESULT: #1354 -> ENIC 2014 - Distributed Generation Impacts on the GBSO
RESULT: #1355 -> ENIC 2018 - Resilient Future
RESULT: #1356 -> ENIC 2014 - NIC Robotics
RESULT: #1357 -> ENIC 2018 - GIL Innovation Partnership
RESULT: #1358 -> ENIC 2018 - Hy4Heat
RESULT: #1359 -> ENIC 2014 - HVDC in Great Britain
RESULT: #1360 -> ENIC 2018 - STASS
RESULT: #1361 -> ENIC 2018 - SAVE Project
RESULT: #1362 -> ENIC 2014 - Systems & Security
RESULT: #1363 -> ENIC 2016 - Day 2
RESULT: #1364 -> ENIC 2016 - Day 3
RESULT: #1365 -> ENIC 2014 - Accelerating Renewable Connections
RESULT: #1366 -> ENIC 2014 - Connecting Renewable Energy In Lincolnshire
RESULT: #1367 -> ENIC 2014 - Heat & Power For Birmingham
RESULT: #1368 -> ENIC 2014 - Using Network Data in a Smart Grid
RESULT: #1369 -> GDN Standardisation of CV Targets Review
RESULT: #1372 -> ON21-PRJ Open Networks Flexibility Connections Explainer and Q&A (19 Aug 2021)
RESULT: #1373 -> ON21-WS1A Flexibility Consultation webinar slides (20 Aug 2021)
RESULT: #1374 -> GIS/PRS/35: 2011 SPECIFICATION FOR GRP HOUSINGS FOR GAS REGULATOR INSTALLATIONS AND ASSOCIATED OPERATION EQUIPMENT
RESULT: #1375 -> GIS/PL2-3:2021 Specification for Polyethylene pipes and fittings for natural gas and suitable manufactured gas Part 3: Butt fusion machines and ancillary equipment
RESULT: #1376 -> ON21-PRJ-AG July Minutes (08 Jul 2021)
RESULT: #1379 -> ON21-WS1B-P5 Network Development Plan Form of Statement (19 Aug 2021)
RESULT: #1380 -> ON21-WS1A-P5 Primacy Rules for Service Conflicts Development and Implementation Plan (26 Aug 2021)
RESULT: #1381 -> ON21-WS1A-P4 Standard Agreement for procuring Flexibility Services (Version 2) (27 Aug 2021)
RESULT: #1382 -> ON21-WS1A-P4 Flexibility Services Standard Agreement Consultation 2021 (27 Aug 2021)
RESULT: #1383 -> ON21-WS1A-P4 Standard Agreement for procuring Flexibility Services - Schedule Structure (27 Aug 2021)
RESULT: #1386 -> ON21-PRJ-AG September Advisory Group Presentation Materials (02 Sep 21)
RESULT: #1387 -> ON21-PRJ-AG Meeting Agenda (02 Sep 2021)
RESULT: #1389 -> ON21-PRJ-AG September Advisory Group Meeting Agenda (02 Sep 2021)
RESULT: #1390 -> ON21-PRJ-Open Governance AG Update (18 Aug 21)
RESULT: #1391 -> ON21-WS1A Open Networks Flexibility Connections Explainer and Q&A (19 Aug 2021)
RESULT: #1392 -> Joint gas network guidance on spot samples
RESULT: #1397 -> ON21 - BusinessGreen 'Flexible Futures' event slides - Dörte Schneeman, Department for Business, Energy and Industrial Strategy (8 Sept 2021)
RESULT: #1398 -> ON21 - BusinessGreen 'Flexible Futures' event slides - Farina Farrier and Dr Avinash Aithal, Energy Networks Association (8 Sept 2021)
RESULT: #1408 -> Gas Goes Green Innovation Impacts
RESULT: #1409 -> ON21-WS1A-P4 Standard Agreement V2 Consultation webinar slidedeck (22 Sep 2021)
RESULT: #1411 -> ON21-PRJ-AG September Advisory Group Minutes (02 Sep 2021)
RESULT: #1413 -> Industrial Clusters pamphlet
RESULT: #1414 -> Industrial Clusters infographic
RESULT: #1415 -> ON21-WS1B-P5 Network Development Plan webinar slidedeck (28 Sep 2021)
RESULT: #1423 -> ON22-PRJ-High Level Scope Document 2022 (19 Oct 21)
RESULT: #1424 -> ON21-PRJ-Open Networks Challenge Group Terms of Reference (19 Oct 2021)
RESULT: #1425 -> ON21-PRJ-Invitation to apply for Challenge Group Chair role (19 Oct 2021)
RESULT: #1429 -> GER1 Issue 8.1
RESULT: #1431 -> GIS/V7-1:2021 Specification for Part 1: Metal-bodied line valves for use at pressures up to 16 bar and construction valves for use at pressures up to 7 bar Addendum to BS EN 13774:2013
RESULT: #1432 -> GIS/14525 Specification for Flanged Adaptors and Mechanical Couplings from DN50 to DN600 and up to 2 bar maximum operating pressure. Gas Industry Standard Addenda to BS EN 14525:2004
RESULT: #1435 -> ON21-PRJ-AG November Advisory Group meeting agenda (04 Nov 2021)
RESULT: #1439 -> ON21-WS3-P1 Consolidated Roadmap data Q3 2021 (29 Oct 2021)
RESULT: #1440 -> ON21-WS3-P2 Conflicts of Interest and Unintended Consequences Register Q3 Heatmap Update (28 Oct 2021)
RESULT: #1441 -> ON21-WS3-P2 CoI and UC Heatmap review Q3 2021 (28 Oct 2021)
RESULT: #1442 -> ON21-WS4-P5 Developing a common approach to Local Area Energy Planning (28 Oct 2021)
RESULT: #1443 -> ON21-WS1A-P8 Apportionment Stakeholder feedback (28 Oct 2021)
RESULT: #1444 -> ON20-WS1B-P2 Distribution Future Energy Scenario (DFES) standardisation
RESULT: #1445 -> ON21-PRJ-AG Presentation Materials (04 Nov 21)
RESULT: #1450 -> Demand Assessment Report for Incremental Capacity between National Grid Bacton IP and BBL Entry/Exit IP Bacton
RESULT: #1451 -> Demand assessment report for incremental capacity between UK (National Grid Moffat IP) and Republic of Ireland (Gas Networks Ireland)
RESULT: #1452 -> Demand Assessment Report for incremental capacity between Interconnector Limited and National Grid Gas plc at the IBT Interconnection Point
RESULT: #1454 -> Entry Customer Forum - May 2021 minutes
RESULT: #1455 -> Entry Customer Forum - June 2021 minutes
RESULT: #1456 -> Entry Customer Forum - September 2021 minutes
RESULT: #1458 -> Getting prepared for winter
RESULT: #1460 -> ON21-PRJ-AG November Advisory Group Feedback (04 Nov 2021)
RESULT: #1462 -> Systems For All Seasons
RESULT: #1463 -> ON18-PRJ Open Networks Connection of Generation Guide
RESULT: #1469 -> Severe weather disruption
RESULT: #1482 -> ON21-WS1B-P9 Whole Electricity System Coordination Register Template (13 Dec 2021)
RESULT: #1483 -> ON21-WS1B-P9 Whole Electricity System Coordination Register Form of Statement (13 Dec 2021)
RESULT: #1484 -> ON21-WS1A-P6 Review of 2021 Non-DSO services activity and next steps (13 Dec 2021)
RESULT: #1485 -> ON21-WS1B-P6 Operational DER Visibility and Monitoring Requirements (13 Dec 2021)
RESULT: #1486 -> ON21-WS1B-P2 Best View Scenario Description and Justification Criteria (13 Dec 2021)
RESULT: #1487 -> ON21-WS1A-P2 DNO and ESO Markets Flexibility Tender Dates for 2022 (13 Dec 2021)
RESULT: #1490 -> Joint GDN Service Level Agreements - Daily Missing Files on Biomethane Sites
RESULT: #1491 -> Standardising Local Gas Treatment Outcome
RESULT: #1492 -> ON21-WS1A-P2 2021 Procurement Process 2021 High-level Summary Paper (22 Dec 2021)
RESULT: #1493 -> ON21-WS1A-P5 Primacy Rules for Service Conflicts - Use Case Prioritisation Framework (22 Dec 2021)
RESULT: #1494 -> ON21-WS1A-P5 Primacy Rules for Service Conflicts - Use Case Prioritisation Supporting Slides (22 Dec 2021)
RESULT: #1495 -> ON21-WS1A-P9 ANM Curtailment Information Sharing Implementation Plan (22 Dec 2021)
RESULT: #1496 -> ON21-WS1B-P5 Network Development Plan (NDP) Form of Statement Template and Process (22 Dec 2021)
RESULT: #1497 -> ON21-WS2-P1 Embedded Capacity Register (ECR) - Implementation Plan for inclusion of assets down to 50kW (22 Dec 2021)
RESULT: #1498 -> ON21-WS4-P1 Whole System CBA End of Year Report (22 Dec 2021)
RESULT: #1499 -> ON21-WS1A-P1 Common Evaluation Methodology (CEM) Tool, User Guide and Summary Slides (22 Dec 2021)
RESULT: #1500 -> ON21-WS1A-P3 ANM Contract Exit - Guidance Document (22 Dec 2021)
RESULT: #1502 -> GIS/C9:2021 Specification for Carbon Steel Castings for Pressure Purposes Above 7 Barg (Supplementary to BS EN 10213)
RESULT: #1503 -> Britain's Hydrogen Blending Delivery Plan
RESULT: #1505 -> ON22-PRJ High-level scope consultation detailed responses (13 Jan 2022) Published
RESULT: #1506 -> ON22-PRJ 2022 Programme Initiation Document (PID) (12 Jan 2022) Published
RESULT: #1507 -> ON22-PRJ 2022 Summary of high-level scope document consultation responses (13 Jan 2022) Published
RESULT: #1508 -> ON22-PRJ 2022 Programme Initiation Document (PID) (13 Jan 2022) Published
RESULT: #1510 -> ON22-WS1A-P1 Common Evaluation Methodology (CEM) and Tool v2.1- User Guide (14 Jan 2022)
RESULT: #1511 -> ON22-WS1A-P1 Statement for Common Evaluation Methodology for Network Investment Decisions v2.0 (14 Jan 2022)
RESULT: #1516 -> Open Networks: Five Years ON
RESULT: #1517 -> ON21-WS2-P4 Connection Agreement Review (27 Jan 2022)
RESULT: #1518 -> ON22-WS4-P4 LA Consultation Paper (27 Jan 2022)
RESULT: #1520 -> ON22-WS2-P1 ECR Digitalisation Design Recommendation v1.1 (14 Dec 2022)
RESULT: #1522 -> ON21-WS1A-P7 Appendix B Mathematical Specification (13 Jan 2022)
RESULT: #1523 -> ON22-WS1A-P7 2021 Baseline Methodologies Final Report (1 Feb 2022)
RESULT: #1525 -> GIS/PL2-1:2022 Specification for Polyethylene pipes and fittings for natural gas and suitable manufactured gas Part 1: General and polyethylene compounds for use in polyethylene pipes and
RESULT: #1527 -> Gas Goes Green - Introducing Britain's Smart Gas Grid
RESULT: #1529 -> ON22-PRG Open Networks Challenge Group Membership List (2023)
RESULT: #1530 -> GER1 Issue 9
RESULT: #1531 -> ON22-PRG-DF Dissemination Forum Membership List (30 Aug 2022)
RESULT: #1536 -> ON22-PRJ-CG Challenge Group Meeting Agenda (24 Feb 2022)
RESULT: #1544 -> ON21-PRJ End of Year Review (17-Feb-2022)
RESULT: #1547 -> ON21-WS1A-P7 Appendix C Functional Specification (21 Feb 2022)
RESULT: #1548 -> ON22-PRJ-Challenge Group slides (24 Feb 2022)
RESULT: #1549 -> ON22-WS1B-P7 RAG Status (17 Feb 2022)
RESULT: #1550 -> ON22-WS1B-P7 Proposal for Operational Data to be shared by DNOs (23 Feb 2022)
RESULT: #1555 -> ON22-PRG Stakeholder Engagement Activity
RESULT: #1556 -> ON22-WS1B-P6 CBA for Operational DER Visibility and Monitoring (16 Feb 2022)
RESULT: #1557 -> ON22-WS1A-P1 Common Evaluation Methodology Tool Consultation (08 Mar 2022)
RESULT: #1559 -> GIS/PL2-8:2022 Specification for Polyethylene pipes and fittings for natural gas and suitable manufactured gas Part 8: Pipes for use at pressures up to 7 bar
RESULT: #1560 -> GIS/PL3: 2022 - Specification for Self Anchoring mechanical fittings for natural gas and suitable manufactured gas
RESULT: #1561 -> GIS/PA10:2022 Specification for Maintenance Painting at Works and Site for Above Ground Pipeline and Plant Installations
RESULT: #1562 -> GIS/PA9:2022 Specification for Paint Systems Properties and Performance Requirements
RESULT: #1564 -> ON22-WS1A-P1 Summary of CEM Tool Stakeholder Feedback (01 Feb 2022)
RESULT: #1565 -> ON22-WS1A-P1 Common Evaluation Methodology Tool Version 2 (14 Jan 2022)
RESULT: #1566 -> ON22-WS1A-P1 CEM Consultation Webinar Slides (08 Mar 2022)
RESULT: #1567 -> ON22-PRJ Challenge Group Minutes (24 Feb 2022)
RESULT: #1568 -> ON22-PRJ Challenge and Actions Log (24 Feb 2022)
RESULT: #1569 -> ON22-PRJ Dissemination Forum Meeting Agenda (24 Mar 2022)
RESULT: #1572 -> ON22-PRJ Dissemination Forum Membership List
RESULT: #1573 -> ON22-PRJ-Dissemination Forum Presentation (24 Mar 2022)
RESULT: #1577 -> Connecting generation to the electricity networks
RESULT: #1578 -> Connecting to the gas network
RESULT: #1579 -> Connecting electric vehicles and heat pumps to the networks
RESULT: #1580 -> Connecting electric vehicle fleets to the network
RESULT: #1581 -> Frequently asked questions about connecting to the networks
RESULT: #1583 -> Requirements for Gas Quality SAT and Annual Maintenance Validation
RESULT: #1584 -> Site Acceptance Testing Expectation
RESULT: #1585 -> ON22-WS1A-P7 Flexibility Baselining Tool User Guide (07 Apr 2022)
RESULT: #1586 -> ON22-WS1A-P0 Overarching common framework for flexibility services scope document (25 Mar 2022)
RESULT: #1587 -> ON22-WS1A-P7 Carbon Reporting Scope (25 Mar 2022)
RESULT: #1588 -> ON22-WS1A-P8 Recommendation for frequency of updates to constraint information heatmaps (25 Mar 2022)
RESULT: #1589 -> ON22-WS1A-P8 RAG status for system generation profiles for curtailment studies
RESULT: #1590 -> ON22-WS1A-P7 Baselining tool handover plan (25 Mar 2022)
RESULT: #1591 -> ON22-WS1B-P2 Alignment of Grid Supply Point Definition (25 Mar 2022)
RESULT: #1592 -> ON22-WS1B-P7 Existing operational and non-operational network data sets (25 Mar 2022)
RESULT: #1594 -> Occupier’s Guidance Wayleave Rates for 2022-23
RESULT: #1595 -> Energy Networks Innovation Strategy 2022
RESULT: #1602 -> GIS-PL2-8:2022 Specification for Polyethylene pipes and fittings for natural gas and suitable manufactured gas Part 8: Pipes for use at pressures up to 7 bar
RESULT: #1603 -> ON22-WS1A-P7 Baseline Tool Dissemination Webinar Slides (20-Apr-22)
RESULT: #1604 -> ON22-WS1A-P1 Common Evaluation Methodology Tool Version 2.2 (25 Aug 2022)
RESULT: #1605 -> Developing future leaders
RESULT: #1606 -> Smashing the glass ceiling
RESULT: #1607 -> Energising people: Kat from SGN
RESULT: #1608 -> Pandemic people power
RESULT: #1609 -> Innovative initiatives focusing on gender diversity
RESULT: #1610 -> Energising people: Victoria from Northern Powergrid
RESULT: #1611 -> Making a positive impact
RESULT: #1612 -> Writing your own future
RESULT: #1613 -> Energising people: Mary from Northern Powergrid
RESULT: #1614 -> Identifying talent without bias
RESULT: #1615 -> ON22-PRJ-CG Challenge Group Meeting Agenda (05 May 2022)
RESULT: #1616 -> GER1 Issue 9.1
RESULT: #1617 -> ON22-WS1A-P4 Gap analysis and recommendations for the alignment of contracting processes (25 Apr 2022)
RESULT: #1618 -> ON22-WS1A-P3 Dispatch interoperability and settlement review of existing practices and gap analysis (05 Apr 2022)
RESULT: #1619 -> ON22-WS1A-P1 and WS4-P1 CEM and Whole System CBA Interactions Report (25 Apr 2022)
RESULT: #1620 -> ON22-WS1A-P3 Dispatch Interoperability and Settlement Scope Document (14 Apr 2022)
RESULT: #1621 -> ON22-PRJ-CG Open Networks Challenge Group Meeting Slides (05 May 2022)
RESULT: #1627 -> GIS/ECE1:2017 Specification for Electrofusion control boxes
RESULT: #1629 -> GIS/ECE1:2017 Specification for Electrofusion control boxes
RESULT: #1630 -> ON21-WS4-P3 Coordinated Regional Data Gathering 2021 Summary (07 Apr 2022)
RESULT: #1632 -> Science, technology, engineering, and mathematics (STEM) ambassador
RESULT: #1633 -> Gas Goes Green Biomethane Injection Study - Phase 1 report
RESULT: #1634 -> Gas Goes Green Biomethane Injection Study - Phase 2 report
RESULT: #1635 -> Gas Goes Green Biomethane Injection Study - Phase 3 report
RESULT: #1636 -> Gas Goes Green Green Gas Scoreboard
RESULT: #1637 -> Entry Customer Forum - November 2021 minutes
RESULT: #1638 -> Entry Customer Forum - January 2022 minutes
RESULT: #1639 -> Entry Customer Forum - March 2022 minutes
RESULT: #1640 -> ON22-WS1A-P5 Primacy Draft Rules Increment 1 (28 Apr 2022)
RESULT: #1641 -> ON22-WS1A-P2 Recommended Steps to Move to Real Time Procurement (21 Apr 2022)
RESULT: #1642 -> ON22-WS1A-P7 Report on Existing Carbon Reporting Methodologies (27 April 2022)
RESULT: #1643 -> ON22-WS3-P2 Conflicts of Interest and Unintended Consequences Register 2022 Q2 Full Update
RESULT: #1648 -> ON22-WS1B-P2 FES & DFES Alignment Requirements and Justification (30 May 2022)
RESULT: #1649 -> ON22-WS1B-P2 FES and DFES Purpose of Energy Scenarios (30 May 2022)
RESULT: #1650 -> ON22-WS1B-P6 DER Visibility and Data Sharing Proposed Change of Scope (30 May 2022)
RESULT: #1654 -> ON22-WS4-P4 Local Whole System Optioneering Service No-Go Recommendation (30 May 2022)
RESULT: #1655 -> ENA Community Energy Forum - 7 June 2022 - Access and Forward-Looking Charges SCR
RESULT: #1657 -> ON22-PRJ Challenge and Actions Log (05 May 2022)
RESULT: #1658 -> ON22-WS2-P2 Queue Management Implementation Tracker (04 May 2022)
RESULT: #1659 -> ON22-PRJ-DF Meeting Agenda (23 Jun 2022)
RESULT: #1661 -> GIS/V6:2021 Specification for STEEL VALVES FOR USE WITH NATURAL GAS AT NORMAL OPERATING PRESSURES ABOVE 7 BAR AND SIZES ABOVE DN15 (SUPPLEMENTARY TO EN13942:2009)
RESULT: #1662 -> ON22-PRG Dissemination Forum Slides (23 Jun 2022)
RESULT: #1665 -> ON22-WS1A-P1 CEM Valuing Optionality Consultation Summary and Next Steps (16 Jun 2022)
RESULT: #1667 -> ON22-WS1B-P2 FES and DFES Building Blocks (16 Jun 2022)
RESULT: #1668 -> ON22-WS1B-P7 RAG Statuses for Progress Sharing Operational Data V2.1 (16 Jun 2022)
RESULT: #1670 -> ON22-WS1A-P6 Active Power Product Review - Draft V3 (23 Jun 2022)
RESULT: #1671 -> ON22-WS1A-P7 Carbon Reporting Methodology - Draft (23 Jun 2022)
RESULT: #1672 -> ON22-WS1A-P3 Initial Dispatch Process Capture Populated (15 Feb 2022)
RESULT: #1673 -> ON22-WS1A-P3 Dispatch Interoperability and Settlement Key Service Parameters (31 May 2022)
RESULT: #1674 -> ON22-WS1A-P3 Dispatch Recommendations for Alignment (23 June 2022)
RESULT: #1675 -> ON22-PRG Challenge Group Slides (07 Jul 2022)
RESULT: #1678 -> ENA HP EVCP Databases Guide Document Version 5
RESULT: #1679 -> ON22-WS1B Whole Electricity System Webinar Slides (27 June 2022)
RESULT: #1680 -> ON22-PRG Challenge Group Meeting Agenda (07 July 2022)
RESULT: #1681 -> ENA SHE Management Conference programme 2022
RESULT: #1684 -> ON20-WS2-P3 Interactivity Process Guide V3 (Dec 2020)
RESULT: #1685 -> All G100 Forms
RESULT: #1686 -> ON22-WS4-P1 Whole System CBA Workshop Slides (July 2022)
RESULT: #1687 -> ENA SHE Management Conference 2022 session 1 Sustainability presentation
RESULT: #1688 -> ENA SHE Management Conference 2022 session 2 Occupational Health presentation
RESULT: #1689 -> ENA SHE Management Conference 2022 session 3 SHE Priorities & Challenges presentation
RESULT: #1690 -> ENA SHE Management Conference 2022 session 4 Forward look presentation
RESULT: #1693 -> ON22-WS1A-P0 Flexibility Figures 2022/23
RESULT: #1696 -> SHE BULLETIN S001 - BLACK PLASTIC CUT-OUT FLASHOVER
RESULT: #1697 -> Response to Ofgem's call for input on future of local energy institutions and governance
RESULT: #1698 -> ON22-PRJ Challenge and Actions Log (07 Jul 2022)
RESULT: #1699 -> ON22-PRG Challenge Group Minutes (07 Jul 2022)
RESULT: #1700 -> ENA EREC G100 Issue 2 Amendment 1 - Technical Requirements Customer Export and Import Limitation Schemes
RESULT: #1701 -> ON22-WS1A-P2 Pre-Qualification Alignment Recommendations (01 Aug 2022)
RESULT: #1702 -> ON22-WS1A-P4 Standard Agreement Service Based Schedule Alignment (01 Aug 2022)
RESULT: #1703 -> ON22-WS1A-P7 Carbon Reporting Methodology (01 Aug 2022)
RESULT: #1704 -> ON22-WS4-P1 Whole System CBA Tool Feedback and Next Steps (01 Aug 2022)
RESULT: #1705 -> ON22-WS1A-P6 Active Power Products Review (01 Aug 2022)
RESULT: #1706 -> ON22-WS1A-P0 Draft Framework and Strategic Roadmap for Flexibility (01 Aug 2022)
RESULT: #1707 -> ON22-WS1A-P8 Common Methodology for Providing Curtailment Estimates (01 Aug 2022)
RESULT: #1708 -> ON22-PRJ-2022 Flexibility Consultation Wrapper Document
RESULT: #1710 -> ENA SHE Management Conference 2022 Q&A sessions
RESULT: #1711 -> ENA SHE Management Conference 2022 Event impact estimate
RESULT: #1717 -> ON22-PRO-BusinessGreen panel session Open Networks slides (24 Aug 2022)
RESULT: #1718 -> ON22-WS1B-P7 RAG statuses for progress sharing operational data Q3 update
RESULT: #1719 -> ON22-PRO-Challenge Group slides (01 Sep 2022)
RESULT: #1720 -> ON22-PRO-Challenge Group meeting agenda (01 Sep 2022)
RESULT: #1721 -> ON22-WS1B-P6 DER Monitoring and Control requirements Use Cases (26 Aug 2022)
RESULT: #1723 -> GIS/LC1:2022 Leak Repair and annular sealants for metallic gas mains and services up to 7bar
RESULT: #1724 -> GIS/V6:2022 STEEL VALVES FOR USE WITH NATURAL GAS AT NORMAL OPERATING PRESSURES ABOVE 7 BAR AND SIZES ABOVE DN15 (SUPPLEMENTARY TO EN13942:2009)
RESULT: #1726 -> Safety
RESULT: #1728 -> Compensation for power cuts or gas supply issues
RESULT: #1732 -> Terms and conditions
RESULT: #1734 -> ON22-PRG Challenge and Actions Log (01 Sep 2022)
RESULT: #1735 -> Next for Net Zero
RESULT: #1737 -> ON22-PRG Dissemination Forum Meeting Agenda (22 Sep 2022)
RESULT: #1738 -> ON22-PRG Dissemination Forum Slides (22 Sep 2022)
RESULT: #1746 -> ON22-PRG Challenge Group Minutes (01 Sep 2022)
RESULT: #1754 -> ON22-PRG-Challenge Group meeting agenda (20 Oct 2022)
RESULT: #1757 -> ON22-PRG Challenge Group Slides (20 Oct 2022)
RESULT: #1758 -> ON22-PRG-CG Challenge Group Slides (20 Oct 2022)
RESULT: #1759 -> ON22-PRG-CG Challenge Group Meeting Agenda (20 Oct 2022)
RESULT: #1761 -> Hydrogen blending capacity maps
RESULT: #1762 -> Gas Goes Green Hydrogen blending capacity maps
RESULT: #1763 -> Gas Goes Green Review Group Terms of Reference
RESULT: #1764 -> Gas Goes Green Insights Forum Terms of Reference
RESULT: #1770 -> What happens during an energy shortage
RESULT: #1775 -> Be Winter Ready: Campaign toolkit
RESULT: #1776 -> Be Winter Ready: Campaign toolkit
RESULT: #1777 -> ON22-PRG Challenge and Actions Log (20 Oct 2022)
RESULT: #1779 -> GIS/E13:2022 Cartridge Type Filters for Use with Natural Gas at Operating Pressures Above 7 Bar
RESULT: #1780 -> GIS/DIN 30652-1 Excess flow valves for gas installation - Addenda to DIN 30652-1, Excess flow valves - Part 1: Excess flow valves for gas installation
RESULT: #1781 -> GIS/DIN 3586 Thermal Cut Off valves for gas installation Addenda to DIN 3586, Thermally Activated Shutting-Off Devices for Gas
RESULT: #1782 -> GIS/F13:2022 Ductile iron and fabricated steel cap ends for use on cast iron, ductile iron and steel gas mains up to 2 bar maximum operating pressure
RESULT: #1783 -> GIS/V7-1:2022 Distribution valves Part 1: Metal-bodied line valves for use at pressures up to 16 bar and construction valves for use at pressures up to 7 bar Addendum to BS EN 13774:2013
RESULT: #1786 -> ON22-PRG Challenge Group Minutes (20 Oct 2022)
RESULT: #1790 -> GIS/V7-3:2022 Distribution valves Part 3: Brass bodied manually operated ball and taper plug valves not exceeding 5 bar maximum operating pressures
RESULT: #1792 -> GIS/PL2-2: 2022 Polyethylene pipes and fittings for natural gas and suitable manufactured gas Part 2: Pipes for use at pressures up to 5.5 bar
RESULT: #1793 -> GIS/TR29: 2022 PIPELINE MARKER POSTS
RESULT: #1794 -> Gas Goes Green Insights Forum agenda (8 December 2022)
RESULT: #1796 -> Gas Goes Green Review Group membership list
RESULT: #1798 -> Common Future End States Report
RESULT: #1799 -> ON22-PRG Dissemination Forum Slides (12 Dec 2022)
RESULT: #1800 -> ON22-WS1B-P7 Gap analysis of existing DNO operational data sharing (14 Oct 2022)
RESULT: #1801 -> ON22-WS1A-P5 Primacy Rules Cost-Benefit Analysis Overview (13 Dec 2022)
RESULT: #1802 -> ON22-WS1A-P5 Primacy Rules Cost-Benefit Analysis Final Report (13 Dec 2022)
RESULT: #1803 -> ON22-WS1A-P6 Reactive Power Review (11 Nov 2022)
RESULT: #1805 -> ON22-WS1A-P7 Carbon Reporting Methodology (17 Nov 2022)
RESULT: #1806 -> ON22-WS1B-P6 Standardisation of DER Monitoring and Control requirements (17 Nov 2022)
RESULT: #1807 -> ON22-WS3-P2 Conflicts of Interest and Unintended Consequences Register 2022 Q4 Update (07 Dec 2022)
RESULT: #1808 -> Gas Goes Green Insights Forum kick off meeting presentation slides (08 December 2022)
RESULT: #1812 -> Care and assisted living providers
RESULT: #1815 -> Powering Improvement
RESULT: #1819 -> Open Networks: 2022 in Review
RESULT: #1820 -> ENA Phased Capacity Guidance
RESULT: #1821 -> ON22-WS1A-P2 Implementing Near-Time Markets (08 Dec 2022)
RESULT: #1824 -> ON22-WS1A-P1 Good Practice Guide for CEM Tool (Dec 2022)
RESULT: #1825 -> ON22-WS1B-P5 NDP FoS 2022 Update v1.4 (Dec 2022)
RESULT: #1826 -> ON22-WS1B-P6 DER Monitoring and Control Requirements Ver 3.1 (14 Dec 22)
RESULT: #1827 -> ON22-WS3 DSO Transition Workstream Closeout Paper (15 Dec 2022)
RESULT: #1828 -> ON22-WS1A ENA Response to the 2022 ON Flexibility Consultation (Dec 2022)
RESULT: #1831 -> Open Networks 2023 Detailed Work Plan (Jan 2023)
RESULT: #1832 -> test pdf
RESULT: #1833 -> ENA Open Networks Strategic Roadmap for Flexibility (2023)
RESULT: #1834 -> Market development
RESULT: #1835 -> Network operation
RESULT: #1836 -> Planning and network development
RESULT: #1837 -> Open Networks 2017-2022
RESULT: #1838 -> Open Networks 2023 Launch Document (Jan 2023)
RESULT: #1840 -> Public_Safety_Leaflet_Emergency_Services_Jan23.pdf
RESULT: #1841 -> Energy Networks Association submission to the 2023 Spring Budget
RESULT: #1842 -> Spring Budget submission 2023
RESULT: #1844 -> Heat Pump Database
RESULT: #1845 -> EVCP Database
RESULT: #1847 -> GIS/RIS1:2023
RESULT: #1848 -> GT/GN/1:2023
RESULT: #1849 -> ON22-WS1B-P2 Best Practice Recommendation (Sep 2022)
RESULT: #1850 -> Open Networks Insights Forum Members
RESULT: #1852 -> 500 error
RESULT: #1853 -> The 105 service
RESULT: #1854 -> ON 2023 Launch Webinar Slides (21 Feb 2023)
RESULT: #1856 -> Contact Test
RESULT: #1857 -> Open Networks Challenge Group Slides (01 Mar 2023)
RESULT: #1858 -> Open Networks Challenge Group Membership List 2023
RESULT: #1859 -> ON Challenge Group Meeting Agenda (01-March 2023)
RESULT: #1861 -> GIS/V6:2023
RESULT: #1862 -> GIS/ECE1:2023
RESULT: #1864 -> Enabling hydrogen blending from industrial clusters
RESULT: #1865 -> GIS/ECE1:2023
RESULT: #1866 -> GIS-V6 2022 Specification for STEEL VALVES FOR USE WITH NATURAL GAS AT NORMAL OPERATING PRESSURES ABOVE 7 BAR AND SIZES ABOVE DN15 (SUPPLEMENTARY TO EN13942:2009)
RESULT: #1867 -> UpgradeMODX
RESULT: #1873 -> Entry Customer Forum - May 2022 Minutes
RESULT: #1875 -> ON-23 Insights Forum Slides (23-March)
RESULT: #1876 -> ON-23 Insights Forum 23-March
RESULT: #1877 -> Open Networks Challenge Group - Challenge and Actions Log (Mar 2023)
RESULT: #1878 -> ON Challenge Group Challenge and Actions Log (23-March-2023)
RESULT: #1879 -> ON Challenge Group Challenge and Actions log 23-March-2023
RESULT: #1880 -> Challenge Group Minutes (01 March 23)
RESULT: #1881 -> ON Primacy Rules for ESO/DNO Coordination Ver 1.0 (Mar 2023)
RESULT: #1882 -> ON Primacy Rules Use Case 1 Testing Report (Mar 2023)
RESULT: #1884 -> Entry Customer Forum - June 2022 Minutes
RESULT: #1885 -> Entry Customer Forum - September 2022 Minutes
RESULT: #1886 -> Entry Customer Forum - November 2022 Minutes
RESULT: #1887 -> Entry Customer Forum - January 2023 Minutes
RESULT: #1888 -> ENA Heat Pump Database
UPDATE prGloo article with id: # and title:
FINISHED: create()