Resources

Fluid-Filled Cable Resources 

Operating Code

ENA's Fluid-filled Cable (FFC) Liaison Group has produced Guidance on the National Operating Code for Fluid-filled Cables. This document has been drawn up between the Environment Agency and the Energy Networks Association member companies.

Guidance on the National Operating Code for the Management of FFC Systems

The Operating Code outlines the arrangements for the management of fluid-filled cable systems and for minimising any environmental impact from their operation. ENA Member Companies work with the Environment Agency to raise awareness of the systems and procedures in place to manage these assets.

Workshops

To support this a number of joint workshops have been run by the industry and the Environment Agency as part of the training programme for staff. More recently a national workshop was held between all companies, the Environment Agency and Natural Resources Wales as part of an ongoing process to raise awareness of the issues associated with managing fluid-filled cables. See the agenda here.

Decommissioning

The decommissioning of fluid-filled cables at the end of their operational life similarly needs to be managed, and the environmental impact of the process assessed to determine the most appropriate decommissioning method. The following guidance outlines the available options to be considered by the companies prior to undertaking any decommissioning work.