Check the table below to see what information ENWL publish and where you can find it. ENWL's data source is its Long Term Development Statement (LTDS). If you have not previously registered with ENWL, you will need to register to access the LTDS.

Data ItemDescriptionAvailable?Source?Registration required?Comments
           
ENWL Distributed Energy Resources Information          
Customer Name Name of party contracted to connect. No      
Customer / Project Site Name of customer site/project name. Yes LTDS LTDS requires registration. Need to open LTDS pdf. Click section Appendix 3 - Table 5 Generation Data. Generic name given.
Connection Site (GSP) Grid Supply Point linked with Customer Site. Yes LTDS LTDS requires registration. Need to open LTDS pdf. Click section Appendix 3 - Table 5 Generation Data. GSP specified.
Supply Point Electrical position where the customer equipment connects to the distribution network. Yes LTDS LTDS requires registration. Need to open LTDS pdf. Click section Appendix 3 - Table 5 Generation Data. GSP and BSP provided.
Primary Name of relevant primary substation. Yes LTDS LTDS requires registration. Need to open LTDS pdf. Click section Appendix 3 - Table 5 Generation Data. Supplying Primary provided.
MW Connected Total MW connected at Project Site. No      
MW Contracted Total MW contracted in Construction Offer. Yes LTDS LTDS requires registration. Need to open LTDS pdf. Click section Appendix 3 - Table 5 Generation Data. Maximum Export Capacity (KVA) and Status as "Accepted".
Export MW Capacity Total MW capacity permitted as per connection agreement. Yes LTDS LTDS requires registration. Need to open LTDS pdf. Click section Appendix 3 - Table 5 Generation Data. Maximum Export Capacity (KVA) and Status as "Connected".
Date Contracted Date customer contracted. No      
Date Connected Date Project connected to network. No      
Status Connected, Being Built, Contracted. Yes LTDS LTDS requires registration. Need to open LTDS pdf. Click section Appendix 3 - Table 5 Generation Data. Status given as either Connected or Accepted.
Licence Area Licence area project site is connected within. Yes LTDS LTDS requires registration. ENWL has only one Licence area.
Plant Type Type of plant connected at the site (wind/solar/etc). Yes LTDS LTDS requires registration. Need to open LTDS pdf. Click section Appendix 3 - Table 5 Generation Data. Technology Type detailed and aligned with RIGs categories.
           
ENWL Works Register Queue Information          
           
Data Item Description Available? Source? Registration required? Comments
Works Reference Reinforcement Reference Number No      
Works Description Reinforcement Title/Summary Description Yes LTDS LTDS requires registration. Need to open LTDS pdf. Click section 5 - Network development Proposals. Unique reference is a combination of "Area of affected Network" and "Outline of Works".
Works Completion Date Planned Completion Date of Works Yes LTDS LTDS requires registration. Need to open LTDS pdf. Click section 5 - Network development Proposals. Month & Year provided.
Driver (Generation/Demand) Are works driven by demand or generation? Yes LTDS LTDS requires registration. Need to open LTDS pdf. Click section 5 - Network development Proposals. A technical driver is provided but demend/generation distinction not made.
Licence Area Licence area where works will be delivered Yes   LTDS - yes ENWL has only one Licence area.
T/D Transmission or Distribution Yes   LTDS - yes All ENWL reinforcement is at distribution level.
Customer Site Name of customer site/project No      
GSP Grid Supply Point linked with Customer Site Yes LTDS LTDS requires registration. Need to open LTDS pdf. Click section 5 - Network development Proposals. Feeding GSP and specific location provided.
Customer Completion Date Completion date of customer connection No